IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
SIC 2426 Hardwood Dimension & Flooring Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0984 # 09 Y:2024 09 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $48,984 $1,053,552 n/a
GT0984 # 08 Y:2024 08 2024 INSTALL OCCUPANCY SENSORS $2,912 $7,675 n/a
GT0984 # 07 Y:2024 07 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $775 $1,950 n/a
GT0984 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,806 $6,230 n/a
GT0984 # 05 Y:2024 05 2024 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $219 $225 n/a
GT0984 # 04 Y:2024 04 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,676 $1,650 n/a
GT0984 # 03 Y:2024 03 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,669 $3,750 n/a
GT0984 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $875 $400 n/a
GT0984 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,281 $1,850 n/a
KS2427 # 06 Y:2024 06 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $45,498 $453,376 n/a
KS2427 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $50,928 $156,644 n/a
KS2427 # 04 Y:2024 04 2024 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $69,076 $156,917 n/a
KS2427 # 03 Y:2024 03 2024 USE OPTIMUM THICKNESS INSULATION $9,550 $6,688 n/a
KS2427 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,216 $90 n/a
KS2427 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,324 $5,480 n/a
GT0690 # 06 Y:2000 06 2000 DEVELOP STANDARD OPERATING PROCEDURES $4,500 $20,700 n/a
GT0690 # 05 Y:2000 05 2000 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES $20,979 $900 n/a
GT0690 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $499 $0 n/a
GT0690 # 03 Y:2000 03 2000 INSTALL SKYLIGHTS $1,332 $4,380 n/a
GT0690 # 02 Y:2000 02 2000 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $1,244 $525 n/a
GT0690 # 01 Y:2000 01 2000 RECOVER WASTE HEAT FROM EQUIPMENT $878 $635 n/a
GT0494 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,762 $15,398 Not Implemented
GT0494 # 10 Y:1993 10 1993 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $2,824 $0 Not Implemented
GT0494 # 09 Y:1993 09 1993 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $657 $1,000 Not Implemented
GT0494 # 08 Y:1993 08 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,652 $1,650 Not Implemented