IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 2426 Hardwood Dimension & Flooring Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0308 # 04 Y:2007 04 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,356 $2,850 Implemented
MS0308 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,541 $142 Implemented
MS0308 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,951 $8,190 Implemented
MS0308 # 01 Y:2007 01 2007 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $8,320 $2,753 Implemented
MS0223 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,538 $8,188 Implemented
MS0223 # 08 Y:2003 08 2003 INSTALL TIMERS AND/OR THERMOSTATS $400 $355 Implemented
MS0223 # 07 Y:2003 07 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,081 $355 Not Implemented
MS0223 # 06 Y:2003 06 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,537 $1,000 Implemented
MS0223 # 05 Y:2003 05 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,829 $3,710 Not Implemented
MS0223 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,878 $4,320 Not Implemented
MS0223 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,532 $411 Implemented
MS0223 # 01 Y:2003 01 2003 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $33,740 $0 Not Implemented
MS0010 # 01 Y:1994 01 1994 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $61,508 $0 Not Implemented
MS0010 # 09 Y:1994 09 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,690 $0 Implemented
MS0010 # 08 Y:1994 08 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,182 $1,991 Implemented
MS0010 # 07 Y:1994 07 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,488 $3,500 Not Implemented
MS0010 # 06 Y:1994 06 1994 USE DEMAND CONTROLLER OR LOAD SHEDDER $5,325 $3,000 Not Implemented
MS0010 # 05 Y:1994 05 1994 INCREASE AMOUNT OF CONDENSATE RETURNED $7,545 $15,000 Not Implemented
MS0010 # 04 Y:1994 04 1994 USE MINIMUM STEAM OPERATING PRESSURE $8,352 $6,000 Not Implemented
MS0010 # 03 Y:1994 03 1994 DIRECT WARMEST AIR TO COMBUSTION INTAKE $13,523 $50,000 Not Implemented
MS0010 # 02 Y:1994 02 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $23,650 $90,000 Not Implemented