IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

118

matching recommendations
Reset
SIC 243 Millwork, Plywood & Structural
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0433 # 02 Y:2011 02 2011 REPAIR AND ELIMINATE STEAM LEAKS $881 $300 Implemented
SD0433 # 03 Y:2011 03 2011 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,821 $5,000 Not Implemented
SD0433 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $3,508 $1,805 Implemented
SF0291 # 04 Y:2004 04 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,135 $222 Not Implemented
SF0291 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,732 $78,810 Implemented
SF0291 # 09 Y:2004 09 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $37,955 $102,295 Not Implemented
SF0291 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $914 $3,294 Implemented
SF0291 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,810 $5,675 Implemented
SF0291 # 07 Y:2004 07 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,676 $22,891 Not Implemented
SF0291 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,433 $0 Not Implemented
SF0291 # 03 Y:2004 03 2004 ADD AREA LIGHTING SWITCHES $9,569 $1,464 Implemented
SF0291 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,113 $720 Implemented
OR0383 # 06 Y:2000 06 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,870 $18,000 Implemented
OR0383 # 07 Y:2000 07 2000 OPTIMIZE PLANT POWER FACTOR $4,282 $11,900 Not Implemented
OR0383 # 05 Y:2000 05 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $26,070 $28,457 Implemented
OR0383 # 04 Y:2000 04 2000 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $38,785 $45,275 Implemented
OR0383 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $43,523 $3,525 Implemented
OR0383 # 02 Y:2000 02 2000 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $114,832 $600 Implemented
OR0383 # 01 Y:2000 01 2000 INSTALL EQUIPMENT TO MOVE PRODUCT $121,300 $252,800 Not Implemented
NV0152 # 05 Y:2000 05 2000 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,244 $0 Implemented
NV0152 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $898 $303 Implemented
NV0152 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $532 $500 Not Implemented
NV0152 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $642 $450 Not Implemented
NV0152 # 01 Y:2000 01 2000 OPTIMIZE PLANT POWER FACTOR $6,243 $5,535 Not Implemented
NV0152 # 06 Y:2000 06 2000 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,178 $3,500 Implemented