IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,511

matching recommendations
Reset
SIC 243 Millwork, Plywood & Structural
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0241 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,567 $1,700 Implemented
LL0241 # 09 Y:2006 09 2006 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,743 $2,445 Not Implemented
LL0241 # 10 Y:2006 10 2006 INSULATE BARE EQUIPMENT $1,977 $2,653 Implemented
LL0241 # 11 Y:2006 11 2006 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $715 $1,400 Not Implemented
LL0241 # 12 Y:2006 12 2006 INSTALL OCCUPANCY SENSORS $213 $270 Not Implemented
LL0241 # 13 Y:2006 13 2006 INSULATE BARE EQUIPMENT $280 $409 Implemented
OR0496 # 01 Y:2006 01 2006 UPGRADE OBSOLETE EQUIPMENT $689,000 $213,000 Not Implemented
OR0496 # 02 Y:2006 02 2006 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $282,000 $212,000 Implemented
OR0496 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $201,300 $301,500 Implemented
OR0496 # 04 Y:2006 04 2006 DIRECT WARMEST AIR TO COMBUSTION INTAKE $66,800 $118,000 Implemented
OR0496 # 05 Y:2006 05 2006 OPTIMIZE PLANT POWER FACTOR $51,400 $28,000 Not Implemented
OR0496 # 06 Y:2006 06 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $33,700 $91,000 Implemented
OR0496 # 07 Y:2006 07 2006 UPGRADE CONTROLS ON COMPRESSORS $8,030 $2,000 Not Implemented
OR0496 # 08 Y:2006 08 2006 USE PHOTOCELL CONTROLS $2,400 $900 Implemented
OR0496 # 09 Y:2006 09 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,425 $0 Not Implemented
OR0496 # 10 Y:2006 10 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $780 $295 Not Implemented
OR0496 # 11 Y:2006 11 2006 UPGRADE CONTROLS ON COMPRESSORS $415 $600 Not Implemented
AS0407 # 01 Y:2005 01 2005 INSTALL EQUIPMENT TO MOVE PRODUCT $257,790 $218,456 Not Implemented
AS0407 # 02 Y:2005 02 2005 USE SOLAR HEAT TO HEAT WATER $1,251 $3,200 Not Implemented
AS0407 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $989 $2,000 Not Implemented
AS0407 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $744 $2,000 Not Implemented
CO0576 # 01 Y:2005 01 2005 INSTALL ROTATING CAROUSELS TO REDUCE SET-UP TIMES $84,000 $30,670 Not Implemented
CO0576 # 02 Y:2005 02 2005 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $4,450 $0 Not Implemented
CO0576 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,540 $190 Implemented
CO0576 # 04 Y:2005 04 2005 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $200 $170 Implemented