IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

45

matching recommendations
Reset
SIC 243 Millwork, Plywood & Structural
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0241 # 02 Y:2006 02 2006 REPAIR AND ELIMINATE STEAM LEAKS $149,914 $3,400 Implemented
LL0241 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $178,198 $64,440 Implemented
LL0241 # 13 Y:2006 13 2006 INSULATE BARE EQUIPMENT $280 $409 Implemented
LL0241 # 12 Y:2006 12 2006 INSTALL OCCUPANCY SENSORS $213 $270 Not Implemented
LL0241 # 11 Y:2006 11 2006 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $715 $1,400 Not Implemented
LL0241 # 10 Y:2006 10 2006 INSULATE BARE EQUIPMENT $1,977 $2,653 Implemented
LL0241 # 09 Y:2006 09 2006 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,743 $2,445 Not Implemented
LL0241 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,567 $1,700 Implemented
LL0241 # 07 Y:2006 07 2006 USE PHOTOCELL CONTROLS $3,211 $600 Implemented
LL0241 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,436 $30 Not Implemented
LL0241 # 05 Y:2006 05 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $20,822 $1,320 Implemented
LL0241 # 04 Y:2006 04 2006 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $55,105 $40,000 Not Implemented
LL0241 # 03 Y:2006 03 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $77,103 $3,196 Implemented
LT0095 # 02 Y:1987 02 1987 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $1,183 $0 Not Implemented
LT0095 # 03 Y:1987 03 1987 IMPROVE LUBRICATION PRACTICES $23,600 $0 Not Implemented
LT0095 # 01 Y:1987 01 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $37,800 $19,000 Not Implemented
LT0095 # 04 Y:1987 04 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,900 $0 Not Implemented
LT0071 # 05 Y:1986 05 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $751 $155 Implemented
LT0071 # 04 Y:1986 04 1986 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $199,300 $690,000 Not Implemented
LT0071 # 03 Y:1986 03 1986 USE OPTIMUM TEMPERATURE $33,764 $3,000 Not Implemented
LT0071 # 02 Y:1986 02 1986 REDUCE EXCESSIVE BOILER BLOWDOWN $20,288 $9,000 Implemented
LT0071 # 01 Y:1986 01 1986 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $52,000 $6,000 Implemented
LT0047 # 03 Y:1985 03 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $41,000 $16,000 Implemented
LT0045 # 02 Y:1985 02 1985 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $217 $191 Implemented
LT0035 # 01 Y:1985 01 1985 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,541 $0 Implemented