Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
45
matching recommendationsSIC | 243 | Millwork, Plywood & Structural |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LL0241 # 02 Y:2006 | 02 | 2006 | REPAIR AND ELIMINATE STEAM LEAKS | $149,914 | $3,400 | Implemented |
LL0241 # 01 Y:2006 | 01 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $178,198 | $64,440 | Implemented |
LL0241 # 13 Y:2006 | 13 | 2006 | INSULATE BARE EQUIPMENT | $280 | $409 | Implemented |
LL0241 # 12 Y:2006 | 12 | 2006 | INSTALL OCCUPANCY SENSORS | $213 | $270 | Not Implemented |
LL0241 # 11 Y:2006 | 11 | 2006 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $715 | $1,400 | Not Implemented |
LL0241 # 10 Y:2006 | 10 | 2006 | INSULATE BARE EQUIPMENT | $1,977 | $2,653 | Implemented |
LL0241 # 09 Y:2006 | 09 | 2006 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $1,743 | $2,445 | Not Implemented |
LL0241 # 08 Y:2006 | 08 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,567 | $1,700 | Implemented |
LL0241 # 07 Y:2006 | 07 | 2006 | USE PHOTOCELL CONTROLS | $3,211 | $600 | Implemented |
LL0241 # 06 Y:2006 | 06 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,436 | $30 | Not Implemented |
LL0241 # 05 Y:2006 | 05 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $20,822 | $1,320 | Implemented |
LL0241 # 04 Y:2006 | 04 | 2006 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $55,105 | $40,000 | Not Implemented |
LL0241 # 03 Y:2006 | 03 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $77,103 | $3,196 | Implemented |
LT0095 # 02 Y:1987 | 02 | 1987 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $1,183 | $0 | Not Implemented |
LT0095 # 03 Y:1987 | 03 | 1987 | IMPROVE LUBRICATION PRACTICES | $23,600 | $0 | Not Implemented |
LT0095 # 01 Y:1987 | 01 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $37,800 | $19,000 | Not Implemented |
LT0095 # 04 Y:1987 | 04 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $12,900 | $0 | Not Implemented |
LT0071 # 05 Y:1986 | 05 | 1986 | INSTALL / REPAIR INSULATION ON STEAM LINES | $751 | $155 | Implemented |
LT0071 # 04 Y:1986 | 04 | 1986 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $199,300 | $690,000 | Not Implemented |
LT0071 # 03 Y:1986 | 03 | 1986 | USE OPTIMUM TEMPERATURE | $33,764 | $3,000 | Not Implemented |
LT0071 # 02 Y:1986 | 02 | 1986 | REDUCE EXCESSIVE BOILER BLOWDOWN | $20,288 | $9,000 | Implemented |
LT0071 # 01 Y:1986 | 01 | 1986 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $52,000 | $6,000 | Implemented |
LT0047 # 03 Y:1985 | 03 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $41,000 | $16,000 | Implemented |
LT0045 # 02 Y:1985 | 02 | 1985 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $217 | $191 | Implemented |
LT0035 # 01 Y:1985 | 01 | 1985 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,541 | $0 | Implemented |