Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsSIC | 243 | Millwork, Plywood & Structural |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LT0013 # 05 Y:1984 | 05 | 1984 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $494 | $50 | Implemented |
LT0013 # 04 Y:1984 | 04 | 1984 | INSTALL / REPAIR INSULATION ON STEAM LINES | $127 | $181 | Implemented |
LT0013 # 03 Y:1984 | 03 | 1984 | COVER OPEN TANKS | $11,045 | $3,631 | Implemented |
LT0013 # 02 Y:1984 | 02 | 1984 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $425 | $561 | Implemented |
LT0013 # 01 Y:1984 | 01 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,540 | $0 | Implemented |
KU0132 # 02 Y:1984 | 02 | 1984 | IMPROVE LUBRICATION PRACTICES | $3,765 | $800 | Implemented |
KU0132 # 14 Y:1984 | 14 | 1984 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $367 | $800 | Implemented |
KU0132 # 13 Y:1984 | 13 | 1984 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $662 | $0 | Implemented |
KU0132 # 12 Y:1984 | 12 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $954 | $0 | Implemented |
KU0132 # 11 Y:1984 | 11 | 1984 | REDUCE VENTILATION AIR | $808 | $0 | Not Implemented |
KU0132 # 10 Y:1984 | 10 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $171 | $50 | Not Implemented |
KU0132 # 09 Y:1984 | 09 | 1984 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $1,418 | $1,110 | Implemented |
KU0132 # 08 Y:1984 | 08 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,443 | $85 | Implemented |
KU0132 # 07 Y:1984 | 07 | 1984 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $238 | $0 | Not Implemented |
KU0132 # 06 Y:1984 | 06 | 1984 | INSTALL AUTOMATIC STACK DAMPER | $840 | $1,625 | Not Implemented |
KU0132 # 05 Y:1984 | 05 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $903 | $0 | Implemented |
KU0132 # 04 Y:1984 | 04 | 1984 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,907 | $1,150 | Not Implemented |
KU0132 # 03 Y:1984 | 03 | 1984 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,978 | $3,155 | Implemented |
KU0132 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,142 | $6,807 | Implemented |
UD0134 # 01 Y:1984 | 01 | 1984 | INSULATE BARE EQUIPMENT | $32,600 | $10,000 | Implemented |
UD0134 # 02 Y:1984 | 02 | 1984 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $3,306 | $0 | Implemented |
UD0134 # 03 Y:1984 | 03 | 1984 | REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE | $4,339 | $10,000 | Implemented |
UD0134 # 04 Y:1984 | 04 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,118 | $3,218 | Not Implemented |
UD0134 # 05 Y:1984 | 05 | 1984 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $230 | $0 | Not Implemented |