IAC logo
IAC Assessment: UD0134
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0134
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1984
Principal Product WOOD VENEER
NAICS n/a
SIC 2435 - Hardwood Veneer And Plywood
Sales $1,000,000-$5,000,000
# of Employees 42
Plant Area (Sq.Ft.) 0
Annual Production 54,500 Thousand Feet
Production Hrs. Annual 2,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $85,000 1,699,883 kWh $0.05
Wood $38,400 16,512 MMBtu $2.33
Other Energy $92,852 24,435 MMBtu $3.80
TOTAL ENERGY COSTS $216,252
RECOMMENDED SAVINGS* $43,593 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $40,245
#|Description Savings
Cost
Status Electricity Usage Wood Other Energy Administrative Changes Electricity Usage Wood Other Energy Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$32,600
Cost:
$10,000
- - - - $32,600 10,000 - - -
-
kWh
-
-
MMBtu
$32,600
10,000
MMBtu
-
-
$
02: 2.6222 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS Savings:
$3,306
Cost:
-
- - - - $3,306 1,014 - - -
-
kWh
-
-
MMBtu
$3,306
1,014
MMBtu
-
-
$
03: 2.1392 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE Savings:
$4,339
Cost:
$10,000
- - $(-1,920) (-1,920) $6,259 1,920 - - -
-
kWh
$(-1,920)
(-1,920)
MMBtu
$6,259
1,920
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,118
Cost:
$3,218
$1,755 28,429 - - - - $1,363 - $1,755
28,429
kWh
-
-
MMBtu
-
-
MMBtu
$1,363
-
$
05: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$230
Cost:
-
$230 4,103 - - - - - - $230
4,103
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$43,593
Cost:
$23,218
$1,985 32,532 $(-1,920) (-1,920) $42,165 12,934 $1,363 - $1,985
32,532
kWh
$(-1,920)
(-1,920)
MMBtu
$42,165
12,934
MMBtu
$1,363
-
$
TOTAL IMPLEMENTED Savings:
$40,245
Cost:
$20,000
- - $(-1,920) (-1,920) $42,165 12,934 - - -
-
kWh
$(-1,920)
(-1,920)
MMBtu
$42,165
12,934
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Wood Other Energy Administrative Changes Electricity Usage Wood Other Energy Administrative Changes