Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
35
matching recommendationsSIC | 243 | Millwork, Plywood & Structural |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0042 # 03 Y:1988 | 03 | 1988 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,349 | $500 | Not Implemented |
OR0042 # 02 Y:1988 | 02 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,164 | $5,000 | Implemented |
OR0042 # 01 Y:1988 | 01 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,776 | $0 | Implemented |
OR0042 # 06 Y:1988 | 06 | 1988 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $36,759 | $0 | Not Implemented |
OR0042 # 04 Y:1988 | 04 | 1988 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,087 | $623 | Implemented |
OR0042 # 05 Y:1988 | 05 | 1988 | OPTIMIZE PLANT POWER FACTOR | $2,293 | $4,800 | Implemented |
OR0032 # 10 Y:1988 | 10 | 1988 | OPTIMIZE PLANT POWER FACTOR | $1,921 | $4,200 | Not Implemented |
OR0032 # 09 Y:1988 | 09 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38 | $80 | Implemented |
OR0032 # 08 Y:1988 | 08 | 1988 | BURN WOOD BY-PRODUCTS FOR HEAT | $23,425 | $50,000 | Not Implemented |
OR0032 # 07 Y:1988 | 07 | 1988 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $438 | $500 | Implemented |
OR0032 # 06 Y:1988 | 06 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,541 | $4,798 | Not Implemented |
OR0032 # 01 Y:1988 | 01 | 1988 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,763 | $0 | Implemented |
OR0032 # 02 Y:1988 | 02 | 1988 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,787 | $0 | Implemented |
OR0032 # 03 Y:1988 | 03 | 1988 | INSULATE BARE EQUIPMENT | $1,339 | $629 | Implemented |
OR0032 # 04 Y:1988 | 04 | 1988 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $9,022 | $5,200 | Implemented |
OR0032 # 05 Y:1988 | 05 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $344 | $280 | Implemented |
AM0041 # 02 Y:1988 | 02 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $690 | $0 | Implemented |
AM0041 # 06 Y:1988 | 06 | 1988 | INSTALL TIMERS AND/OR THERMOSTATS | $305 | $225 | Not Implemented |
AM0041 # 03 Y:1988 | 03 | 1988 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $476 | $0 | Not Implemented |
AT0117 # 07 Y:1988 | 07 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $597 | $200 | Implemented |
AT0117 # 06 Y:1988 | 06 | 1988 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,272 | $3,000 | Not Implemented |
AT0117 # 05 Y:1988 | 05 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,049 | $525 | Implemented |
AM0041 # 05 Y:1988 | 05 | 1988 | IMPROVE LUBRICATION PRACTICES | $395 | $0 | Implemented |
AT0117 # 03 Y:1988 | 03 | 1988 | IMPROVE LUBRICATION PRACTICES | $468 | $0 | Implemented |
AT0117 # 02 Y:1988 | 02 | 1988 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,302 | $2,745 | Implemented |