IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,179

matching recommendations
Reset
SIC 2431 Millwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0001 # 05 Y:2007 05 2007 UTILIZE JOB COSTING SOFTWARE $31,200 $8,489 Not Implemented
UA0001 # 06 Y:2007 06 2007 MINIMIZE WATER USAGE $564 $1,110 Not Implemented
UA0001 # 07 Y:2007 07 2007 RECOVER AND REUSE WASTE MATERIAL $6,000 $0 Not Implemented
OR0505 # 01 Y:2006 01 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $18,900 $0 Implemented
OR0505 # 02 Y:2006 02 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,600 $0 Implemented
OR0505 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,000 $0 Not Implemented
OR0505 # 04 Y:2006 04 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,300 $600 Not Implemented
OR0505 # 05 Y:2006 05 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $36,760 $2,700 Not Implemented
OR0505 # 06 Y:2006 06 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $17,000 $8,000 Not Implemented
OR0505 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,000 $1,000 Not Implemented
OR0505 # 08 Y:2006 08 2006 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $168,270 $185,000 Implemented
OR0505 # 09 Y:2006 09 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,100 $32,300 Not Implemented
WI0524 # 01 Y:2006 01 2006 AUTOMATE PAYROLL SYSTEM $7,000 $0 Not Implemented
WI0524 # 02 Y:2006 02 2006 IMPROVE SPACE COMFORT CONDITIONING $6,600 $1,100 Not Implemented
WI0524 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,495 $4,160 Not Implemented
WI0524 # 04 Y:2006 04 2006 USE SYNTHETIC LUBRICANT $768 $0 Not Implemented
WI0524 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $658 $640 Not Implemented
WI0524 # 06 Y:2006 06 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $350 $380 Not Implemented
WI0524 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $212 $0 Not Implemented
WI0524 # 08 Y:2006 08 2006 INSTALL OCCUPANCY SENSORS $192 $150 Not Implemented
MI0122 # 01 Y:2006 01 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $18,965 $5,163 Not Implemented
MI0122 # 02 Y:2006 02 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $15,874 $3,709 Not Implemented
MI0122 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,318 $1,074 Not Implemented
MI0122 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,569 $1,074 Not Implemented
MI0122 # 05 Y:2006 05 2006 UPGRADE OBSOLETE EQUIPMENT $1,134 $28 Not Implemented