IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,179

matching recommendations
Reset
SIC 2431 Millwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0128 # 03 Y:1991 03 1991 INSTALL SET-BACK TIMERS $651 $0 Implemented
OR0128 # 04 Y:1991 04 1991 RECOVER MECHANICAL ENERGY $15,535 $4,270 Implemented
OR0128 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $545 $0 Implemented
OR0128 # 06 Y:1991 06 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $571 $1,000 Implemented
OR0128 # 07 Y:1991 07 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $88 $189 Implemented
OR0128 # 08 Y:1991 08 1991 OPTIMIZE PLANT POWER FACTOR $308 $750 Implemented
ND0005 # 01 Y:1991 01 1991 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,750 $0 Implemented
ND0005 # 02 Y:1991 02 1991 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $80 $200 Implemented
ND0005 # 03 Y:1991 03 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $720 $3,127 Implemented
ND0005 # 04 Y:1991 04 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,663 $6,401 Implemented
ND0005 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $180 $124 Implemented
ND0005 # 06 Y:1991 06 1991 RECOVER WASTE HEAT FROM EQUIPMENT $535 $500 Implemented
ND0005 # 07 Y:1991 07 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $360 $100 Implemented
ND0005 # 08 Y:1991 08 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $78 $0 Implemented
OR0119 # 01 Y:1991 01 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $30,780 $600 Not Implemented
OR0119 # 02 Y:1991 02 1991 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $3,126 $2,580 Not Implemented
OR0119 # 03 Y:1991 03 1991 INSULATE FEEDWATER TANK $553 $496 Not Implemented
OR0119 # 04 Y:1991 04 1991 OPTIMIZE PLANT POWER FACTOR $13,571 $12,150 Not Implemented
OR0119 # 05 Y:1991 05 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,373 $6,000 Not Implemented
OR0119 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,080 $0 Not Implemented
OR0119 # 07 Y:1991 07 1991 REDUCE FLUID FLOW RATES $5,381 $12,545 Not Implemented
OR0119 # 08 Y:1991 08 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,268 $4,135 Not Implemented
OR0119 # 09 Y:1991 09 1991 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $2,630 $8,930 Not Implemented
OR0119 # 10 Y:1991 10 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,296 $14,125 Not Implemented
AS0027 # 01 Y:1991 01 1991 REDUCE VENTILATION AIR $4,948 $0 Implemented