IAC Assessment: OR0119
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0119
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1991
Principal Product SOLID WOOD DOORS
NAICS n/a
SIC 2431 - Millwork
Sales $10,000,000-$50,000,000
# of Employees 280
Plant Area (Sq.Ft.) 0
Annual Production 414,450 Pieces
Production Hrs. Annual 4,160
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $310,916 10,507,913 kWh $0.03
TOTAL ENERGY COSTS $310,916
RECOMMENDED SAVINGS* $67,058 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Wood Administrative Changes Electricity Usage Wood Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$30,780
Cost:
$600
- - $30,780 17,645 - - -
-
kWh
$30,780
17,645
MMBtu
-
-
$
02: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$3,126
Cost:
$2,580
- - $3,126 1,792 - - -
-
kWh
$3,126
1,792
MMBtu
-
-
$
03: 2.2123 INSULATE FEEDWATER TANK Savings:
$553
Cost:
$496
- - $553 317 - - -
-
kWh
$553
317
MMBtu
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$13,571
Cost:
$12,150
$13,571 - - - - - $13,571
-
kWh
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,373
Cost:
$6,000
$5,373 227,726 - - - - $5,373
227,726
kWh
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,080
Cost:
-
$532 17,878 - - $548 - $532
17,878
kWh
-
-
MMBtu
$548
-
$
07: 2.5123 REDUCE FLUID FLOW RATES Savings:
$5,381
Cost:
$12,545
$5,381 298,359 - - - - $5,381
298,359
kWh
-
-
MMBtu
-
-
$
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,268
Cost:
$4,135
$1,268 37,808 - - - - $1,268
37,808
kWh
-
-
MMBtu
-
-
$
09: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$2,630
Cost:
$8,930
- - $2,630 1,508 - - -
-
kWh
$2,630
1,508
MMBtu
-
-
$
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,296
Cost:
$14,125
$3,296 115,475 - - - - $3,296
115,475
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$67,058
Cost:
$61,561
$29,421 697,246 $37,089 21,262 $548 - $29,421
697,246
kWh
$37,089
21,262
MMBtu
$548
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Wood Administrative Changes Electricity Usage Wood Administrative Changes