IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

841

matching recommendations
Reset
SIC 2431 Millwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0562 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $1,447 $2,724 Implemented
OR0562 # 01 Y:2010 01 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $8,447 $2,500 Implemented
OR0562 # 04 Y:2010 04 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,192 $0 Implemented
OR0562 # 02 Y:2010 02 2010 BURN A LESS EXPENSIVE GRADE OF FUEL $6,592 $14,997 Not Implemented
TT0046 # 01 Y:2010 01 2010 REDUCE VENTILATION AIR $42,784 $0 Not Implemented
TT0046 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,696 $2,900 Implemented
TT0046 # 02 Y:2010 02 2010 OPTIMIZE PLANT POWER FACTOR $9,000 $15,300 Not Implemented
MA0655 # 03 Y:2010 03 2010 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,768 $200 Implemented
MA0655 # 02 Y:2010 02 2010 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $4,912 $18,270 Not Implemented
MA0655 # 04 Y:2010 04 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $1,570 $4,500 Not Implemented
MA0655 # 01 Y:2010 01 2010 INSULATE BARE EQUIPMENT $10,631 $32,201 Not Implemented
MA0655 # 05 Y:2010 05 2010 INSTALL OCCUPANCY SENSORS $534 $2,640 Not Implemented
CO0623 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,250 $1,000 Not Implemented
CO0623 # 03 Y:2009 03 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $970 $4,840 Not Implemented
CO0623 # 05 Y:2009 05 2009 USE SOLAR HEAT TO MAKE ELECTRICTY $1,850 $17,500 Not Implemented
CO0623 # 02 Y:2009 02 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,280 $15,890 Not Implemented
CO0623 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,140 $8,210 Not Implemented
CO0622 # 04 Y:2009 04 2009 UPGRADE CONTROLS ON COMPRESSORS $1,640 $70 Not Implemented
CO0622 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,540 $1,000 Not Implemented
CO0622 # 03 Y:2009 03 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,500 $110 Not Implemented
CO0622 # 01 Y:2009 01 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,470 $10,470 Not Implemented
IA0439 # 03 Y:2009 03 2009 INSTALL OCCUPANCY SENSORS $461 $359 Not Implemented
IA0439 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $741 $469 Implemented
IA0439 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $662 $1,585 Implemented
IA0439 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,905 $81 Implemented