IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 2434 Wood Kitchen Cabinets
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1701 # 02 Y:2017 02 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,847 $4,000 Not Implemented
UK1701 # 13 Y:2017 13 2017 USE PHOTOCELL CONTROLS $1,070 $800 Not Implemented
UK1701 # 12 Y:2017 12 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,682 $5,300 Not Implemented
UK1701 # 11 Y:2017 11 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,452 $2,100 Not Implemented
UK1701 # 10 Y:2017 10 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,915 $0 Not Implemented
UK1701 # 09 Y:2017 09 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,426 $1,350 Not Implemented
UK1701 # 08 Y:2017 08 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,875 $1,500 Not Implemented
UK1701 # 07 Y:2017 07 2017 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $3,158 $393 Not Implemented
UK1701 # 06 Y:2017 06 2017 INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS $1,690 $2,875 Not Implemented
UK1701 # 05 Y:2017 05 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,902 $10,000 Not Implemented
UK1701 # 04 Y:2017 04 2017 INSTALL OCCUPANCY SENSORS $257 $384 Not Implemented
UK1701 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,878 $11,800 Not Implemented
UK1701 # 01 Y:2017 01 2017 USE ONLY CERTIFIED MOTOR REPAIR SHOPS $10,415 $8,440 Not Implemented
TN0683 # 01 Y:2000 01 2000 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $25,630 $892 Not Implemented
TN0683 # 10 Y:2000 10 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $197 $352 Implemented
TN0683 # 09 Y:2000 09 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $506 $0 Implemented
TN0683 # 08 Y:2000 08 2000 INSTALL SET-BACK TIMERS $1,425 $2,110 Implemented
TN0683 # 07 Y:2000 07 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $2,735 $1,580 Not Implemented
TN0683 # 06 Y:2000 06 2000 INSULATE BARE EQUIPMENT $3,365 $192 Not Implemented
TN0683 # 05 Y:2000 05 2000 ELIMINATE/REDUCE AN OPERATION $6,000 $17,000 Not Implemented
TN0683 # 04 Y:2000 04 2000 RECOVER WASTE HEAT FROM EQUIPMENT $6,404 $1,350 Not Implemented
TN0683 # 03 Y:2000 03 2000 REUSE / RECYCLE/ SELL PAPER PRODUCTS $10,570 $640 Implemented
TN0683 # 02 Y:2000 02 2000 $58,500 $66,430 Implemented