Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
22
matching recommendationsSIC | 2434 | Wood Kitchen Cabinets |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0926 # 02 Y:2024 | 02 | 2024 | OPTIMIZE PLANT POWER FACTOR | $22,740 | $22,490 | n/a |
AM0926 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,460 | $33 | n/a |
AM0926 # 04 Y:2024 | 04 | 2024 | USE PHOTOCELL CONTROLS | $410 | $60 | n/a |
AM0926 # 05 Y:2024 | 05 | 2024 | USE SYNTHETIC LUBRICANT | $410 | $10 | n/a |
AM0926 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $190 | $250 | n/a |
AM0926 # 01 Y:2024 | 01 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $190,860 | $18,580 | n/a |
WV0665 # 12 Y:2024 | 12 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,582 | $375 | n/a |
WV0665 # 11 Y:2024 | 11 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,829 | $9,140 | n/a |
WV0665 # 10 Y:2024 | 10 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,835 | $150 | n/a |
WV0665 # 09 Y:2024 | 09 | 2024 | DEVELOP A REPAIR/REPLACE POLICY | $2,096 | $1,417 | n/a |
WV0665 # 08 Y:2024 | 08 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,306 | $1,070 | n/a |
WV0665 # 07 Y:2024 | 07 | 2024 | INSULATE BARE EQUIPMENT | $3,763 | $2,971 | n/a |
WV0665 # 06 Y:2024 | 06 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,064 | $3,296 | n/a |
WV0665 # 05 Y:2024 | 05 | 2024 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $6,272 | $1,500 | n/a |
WV0665 # 04 Y:2024 | 04 | 2024 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $7,315 | $22,800 | n/a |
WV0665 # 03 Y:2024 | 03 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $7,375 | $13,475 | n/a |
WV0665 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $61,926 | $238,677 | n/a |
WV0665 # 01 Y:2024 | 01 | 2024 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $100,715 | $390,000 | n/a |
SF0615 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,315 | $55,046 | n/a |
SF0615 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $941 | $1,884 | n/a |
SF0615 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,843 | $2,120 | n/a |
SF0615 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,570 | $0 | n/a |