IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

374

matching recommendations
Reset
SIC 2435 Hardwood Veneer And Plywood
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AT0066 # 01 Y:1987 01 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $878 $1,605 Implemented
AT0066 # 02 Y:1987 02 1987 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $1,135 $2,000 Implemented
AT0066 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $278 $157 Not Implemented
AT0066 # 04 Y:1987 04 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $771 $0 Implemented
LT0058 # 01 Y:1986 01 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,430 $600 Implemented
LT0058 # 02 Y:1986 02 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $1,604 $348 Implemented
LT0058 # 03 Y:1986 03 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,130 $362 Implemented
LT0058 # 04 Y:1986 04 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $578 $865 Implemented
LT0058 # 05 Y:1986 05 1986 BURN WOOD BY-PRODUCTS FOR HEAT $79,900 $225,000 Not Implemented
LT0045 # 01 Y:1985 01 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $770 $0 Implemented
LT0045 # 02 Y:1985 02 1985 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $217 $191 Implemented
LT0045 # 03 Y:1985 03 1985 COVER OPEN TANKS $44,800 $14,000 Not Implemented
LT0045 # 04 Y:1985 04 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,671 $6,000 Implemented
LT0045 # 05 Y:1985 05 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $595 $75 Implemented
LT0013 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,540 $0 Implemented
LT0013 # 02 Y:1984 02 1984 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $425 $561 Implemented
LT0013 # 03 Y:1984 03 1984 COVER OPEN TANKS $11,045 $3,631 Implemented
LT0013 # 04 Y:1984 04 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $127 $181 Implemented
LT0013 # 05 Y:1984 05 1984 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $494 $50 Implemented
UD0134 # 01 Y:1984 01 1984 INSULATE BARE EQUIPMENT $32,600 $10,000 Implemented
UD0134 # 02 Y:1984 02 1984 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $3,306 $0 Implemented
UD0134 # 03 Y:1984 03 1984 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $4,339 $10,000 Implemented
UD0134 # 04 Y:1984 04 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,118 $3,218 Not Implemented
UD0134 # 05 Y:1984 05 1984 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $230 $0 Not Implemented