374
matching recommendationsSIC | 2435 | Hardwood Veneer And Plywood |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0468 # 03 Y:2004 | 03 | 2004 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $3,000 | $0 | Implemented |
OR0468 # 04 Y:2004 | 04 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $22,000 | $1,200 | Implemented |
OR0468 # 05 Y:2004 | 05 | 2004 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $72,800 | $13,600 | Not Implemented |
OR0468 # 06 Y:2004 | 06 | 2004 | INSTALL OCCUPANCY SENSORS | $3,200 | $3,100 | Not Implemented |
OR0468 # 07 Y:2004 | 07 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $29,200 | $27,800 | Implemented |
OR0468 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,700 | $13,800 | Implemented |
OR0468 # 09 Y:2004 | 09 | 2004 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $14,800 | $15,700 | Implemented |
OR0468 # 10 Y:2004 | 10 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $15,800 | $26,600 | Implemented |
OR0468 # 11 Y:2004 | 11 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,650 | $24,900 | Not Implemented |
OR0468 # 12 Y:2004 | 12 | 2004 | $102,400 | $242,000 | Not Implemented | |
GT0765 # 01 Y:2003 | 01 | 2003 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $3,130 | $0 | Implemented |
GT0765 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,790 | $1,300 | Implemented |
GT0765 # 03 Y:2003 | 03 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $940 | $1,106 | Not Implemented |
GT0765 # 04 Y:2003 | 04 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,180 | $6,000 | Implemented |
GT0765 # 05 Y:2003 | 05 | 2003 | USE MINIMUM STEAM OPERATING PRESSURE | $750 | $0 | Not Implemented |
GT0765 # 06 Y:2003 | 06 | 2003 | IMPROVE LUBRICATION PRACTICES | $320 | $0 | Not Implemented |
GT0765 # 07 Y:2003 | 07 | 2003 | TREAT AND REUSE RINSE WATERS | $1,775 | $5,450 | Not Implemented |
GT0765 # 08 Y:2003 | 08 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $420 | $460 | Not Implemented |
GT0765 # 09 Y:2003 | 09 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $1,155 | $300 | Not Implemented |
GT0765 # 10 Y:2003 | 10 | 2003 | BURN A LESS EXPENSIVE GRADE OF FUEL | $61,630 | $250,000 | Not Implemented |
GT0765 # 11 Y:2003 | 11 | 2003 | REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE | $7,430 | $12,000 | Not Implemented |
AS0344 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,169 | $6,136 | Implemented |
AS0344 # 02 Y:2003 | 02 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $512 | $5,250 | Not Implemented |
AS0344 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,587 | $10,835 | Implemented |
AS0344 # 04 Y:2003 | 04 | 2003 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $473 | $21 | Implemented |