Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
13
matching recommendationsSIC | 2436 | Softwood Veneer And Plywood |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0519 # 01 Y:2007 | 01 | 2007 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $5,658,000 | $660,000 | Not Implemented |
OR0519 # 02 Y:2007 | 02 | 2007 | REDUCE EXCESS STEAM BLEEDING | $548,400 | $28,000 | Implemented |
OR0519 # 03 Y:2007 | 03 | 2007 | USE OPTIMUM THICKNESS INSULATION | $86,900 | $380,160 | Not Implemented |
OR0519 # 04 Y:2007 | 04 | 2007 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $17,950 | $11,700 | Not Implemented |
OR0519 # 05 Y:2007 | 05 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $16,700 | $35,900 | Implemented |
OR0519 # 06 Y:2007 | 06 | 2007 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $102,000 | $33,700 | Implemented |
OR0519 # 07 Y:2007 | 07 | 2007 | UPGRADE CONTROLS ON COMPRESSORS | $52,800 | $40,500 | Implemented |
OR0519 # 08 Y:2007 | 08 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,400 | $12,400 | Implemented |
OR0519 # 09 Y:2007 | 09 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $47,500 | $109,300 | Implemented |
OR0519 # 10 Y:2007 | 10 | 2007 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $42,000 | $61,300 | Not Implemented |
OR0519 # 11 Y:2007 | 11 | 2007 | OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE | $16,700 | $5,100 | Not Implemented |
OR0519 # 12 Y:2007 | 12 | 2007 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $11,500 | $16,000 | Not Implemented |
OR0519 # 13 Y:2007 | 13 | 2007 | INSTALL SKYLIGHTS | $37,300 | $170,250 | Not Implemented |