IAC Assessment: OR0519
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0519
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2007
Principal Product plywood
NAICS 321211 - Hardwood Veneer and Plywood Manufacturing
SIC 2436 - Softwood Veneer And Plywood
Sales $100,000,000-$500,000,000
# of Employees 409
Plant Area (Sq.Ft.) 560,000
Annual Production 400,000 Thousand Feet
Production Hrs. Annual 8,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,107,943 33,033,638 kWh $0.03
Electricity Demand $162,769 65,369 kW-months/year $2.49
Natural Gas $365,237 30,081 MMBtu $12.14
Wood $2,130,000 800,000 MMBtu $2.66
TOTAL ENERGY COSTS $3,765,949
RECOMMENDED SAVINGS* $6,650,150 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $779,800
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Wood Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Increase in Production Electricity Usage Electricity Demand Natural Gas Wood Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Increase in Production
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $ $ $ $ %
01: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$5,658,000
Cost:
$660,000
- - - - - - - - - - - - - - $5,658,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
-
-
$
$5,658,000
-
%
02: 2.2162 REDUCE EXCESS STEAM BLEEDING Savings:
$548,400
Cost:
$28,000
- - - - $201,300 16,579 $347,100 129,995 - - - - - - - - -
-
kWh
-
-
kW-months/year
$201,300
16,579
MMBtu
$347,100
129,995
MMBtu
-
-
$
-
-
$
-
-
$
-
-
%
03: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$86,900
Cost:
$380,160
- - - - - - $86,900 32,533 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$86,900
32,533
MMBtu
-
-
$
-
-
$
-
-
$
-
-
%
04: 2.2711 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING Savings:
$17,950
Cost:
$11,700
- - - - - - - - - - - - $17,950 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
$17,950
-
$
-
-
%
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$16,700
Cost:
$35,900
$(-1,800) (-49,200) $(-300) (-7) $18,800 1,550 - - - - - - - - - - $(-1,800)
(-49,200)
kWh
$(-300)
(-7)
kW-months/year
$18,800
1,550
MMBtu
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
%
06: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$102,000
Cost:
$33,700
$102,000 2,822,300 - - - - - - - - - - - - - - $102,000
2,822,300
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
%
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$52,800
Cost:
$40,500
$46,800 1,293,100 $6,000 136 - - - - - - - - - - - - $46,800
1,293,100
kWh
$6,000
136
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
%
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$12,400
Cost:
$12,400
$10,800 298,900 $1,600 36 - - - - - - - - - - - - $10,800
298,900
kWh
$1,600
36
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
%
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$47,500
Cost:
$109,300
$47,500 1,314,704 - - - - - - - - - - - - - - $47,500
1,314,704
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
%
10: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$42,000
Cost:
$61,300
$36,900 970,800 $5,100 117 - - - - - - - - - - - - $36,900
970,800
kWh
$5,100
117
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
%
11: 2.6226 OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE Savings:
$16,700
Cost:
$5,100
$7,900 219,000 $1,300 30 - - - - - - $7,500 - - - - - $7,900
219,000
kWh
$1,300
30
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
$7,500
-
$
-
-
$
-
-
%
12: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$11,500
Cost:
$16,000
$2,830 78,840 $420 9 - - - - - - - - $8,250 - - - $2,830
78,840
kWh
$420
9
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
$8,250
-
$
-
-
%
13: 2.7145 INSTALL SKYLIGHTS Savings:
$37,300
Cost:
$170,250
$24,710 683,600 $4,240 90 - - - - $8,350 - - - - - - - $24,710
683,600
kWh
$4,240
90
kW-months/year
-
-
MMBtu
-
-
MMBtu
$8,350
-
$
-
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$6,650,150
Cost:
$1,564,310
$277,640 7,632,044 $18,360 411 $220,100 18,129 $434,000 162,528 $8,350 - $7,500 - $26,200 - $5,658,000 - $277,640
7,632,044
kWh
$18,360
411
kW-months/year
$220,100
18,129
MMBtu
$434,000
162,528
MMBtu
$8,350
-
$
$7,500
-
$
$26,200
-
$
$5,658,000
-
%
TOTAL IMPLEMENTED Savings:
$779,800
Cost:
$259,800
$205,300 5,679,804 $7,300 165 $220,100 18,129 $347,100 129,995 - - - - - - - - $205,300
5,679,804
kWh
$7,300
165
kW-months/year
$220,100
18,129
MMBtu
$347,100
129,995
MMBtu
-
-
$
-
-
$
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $ $ $ $ %
Electricity Usage Electricity Demand Natural Gas Wood Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Increase in Production Electricity Usage Electricity Demand Natural Gas Wood Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Increase in Production