IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

690

matching recommendations
Reset
SIC 249 Miscellaneous Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AT0101 # 01 Y:1988 01 1988 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,298 $0 Implemented
AT0101 # 02 Y:1988 02 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,260 $0 Implemented
AT0101 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,900 $1,041 Implemented
AT0101 # 04 Y:1988 04 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $795 $799 Implemented
AT0101 # 05 Y:1988 05 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,653 $0 Implemented
AT0101 # 06 Y:1988 06 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $697 $600 Implemented
AM0019 # 01 Y:1988 01 1988 RECOVER WASTE HEAT FROM EQUIPMENT $3,753 $12,132 Implemented
AM0019 # 02 Y:1988 02 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,617 $520 Implemented
AM0019 # 03 Y:1988 03 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $550 $700 Implemented
LT0096 # 01 Y:1987 01 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $850 $1,050 Implemented
LT0096 # 02 Y:1987 02 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,574 $300 Implemented
LT0096 # 03 Y:1987 03 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,090 $300 Implemented
LT0096 # 04 Y:1987 04 1987 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,330 $207 Implemented
LT0096 # 05 Y:1987 05 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $354 $0 Implemented
LT0096 # 06 Y:1987 06 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $83 $36 Implemented
AT0049 # 01 Y:1986 01 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,135 $1,957 Implemented
AT0049 # 02 Y:1986 02 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,090 $3,879 Implemented
AT0049 # 04 Y:1986 04 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,100 $500 Implemented
ST0073 # 01 Y:1986 01 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,796 $80 Implemented
ST0073 # 02 Y:1986 02 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,101 $0 Implemented
ST0073 # 03 Y:1986 03 1986 INSTALL AUTOMATIC STACK DAMPER $7,099 $4,042 Implemented
ST0073 # 05 Y:1986 05 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $2,465 $0 Implemented
ST0073 # 08 Y:1986 08 1986 INSTALL TIMERS AND/OR THERMOSTATS $3,822 $1,000 Implemented
UD0185 # 01 Y:1985 01 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $33,827 $54,000 Implemented
UD0185 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,629 $30,202 Implemented