IAC logo
IAC Assessment: LT0096
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LT0096
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana Tech
Assessment Year 1987
Principal Product RAILROAD TIES
NAICS n/a
SIC 2491 - Wood Preserving
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 0
Annual Production 500,000 Pieces
Production Hrs. Annual 8,736
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $39,179 565,944 kWh $0.07
Natural Gas $102,778 26,796 MMBtu $3.84
TOTAL ENERGY COSTS $141,957
RECOMMENDED SAVINGS* $6,281 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,281
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$850
Cost:
$1,050
$850 13,189 - - $850
13,189
kWh
-
-
MMBtu
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,574
Cost:
$300
- - $2,574 660 -
-
kWh
$2,574
660
MMBtu
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,090
Cost:
$300
- - $1,090 280 -
-
kWh
$1,090
280
MMBtu
04: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$1,330
Cost:
$207
- - $1,330 340 -
-
kWh
$1,330
340
MMBtu
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$354
Cost:
-
$354 5,569 - - $354
5,569
kWh
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$83
Cost:
$36
$83 1,172 - - $83
1,172
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$6,281
Cost:
$1,893
$1,287 19,930 $4,994 1,280 $1,287
19,930
kWh
$4,994
1,280
MMBtu
TOTAL IMPLEMENTED Savings:
$6,281
Cost:
$1,893
$1,287 19,930 $4,994 1,280 $1,287
19,930
kWh
$4,994
1,280
MMBtu