Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
38
matching recommendationsSIC | 249 | Miscellaneous Wood Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS2420 # 05 Y:2024 | 05 | 2024 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $24,642 | $68,828 | n/a |
LS2420 # 06 Y:2024 | 06 | 2024 | INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE | $11,877 | $51,800 | n/a |
LS2420 # 04 Y:2024 | 04 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $9,307 | $21,000 | n/a |
LS2420 # 01 Y:2024 | 01 | 2024 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $7,485 | $0 | n/a |
LS2420 # 03 Y:2024 | 03 | 2024 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $16,356 | $15,100 | n/a |
LS2420 # 02 Y:2024 | 02 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $1,025 | $25 | n/a |
NL0094 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,784 | $4,500 | n/a |
NL0094 # 07 Y:2024 | 07 | 2024 | USE PHOTOCELL CONTROLS | $196 | $97 | n/a |
NL0094 # 05 Y:2024 | 05 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $635 | $583 | n/a |
NL0094 # 06 Y:2024 | 06 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $332 | $160 | n/a |
NL0094 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $731 | $2,110 | n/a |
NL0094 # 01 Y:2024 | 01 | 2024 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $72,558 | $568,000 | n/a |
NL0094 # 03 Y:2024 | 03 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,003 | $2,741 | n/a |
SJ0020 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $178 | $770 | n/a |
SJ0020 # 05 Y:2024 | 05 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,344 | $0 | n/a |
SJ0020 # 06 Y:2024 | 06 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,851 | $0 | n/a |
SJ0020 # 07 Y:2024 | 07 | 2024 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $2,380 | $0 | n/a |
SJ0020 # 08 Y:2024 | 08 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $2,868 | $15,989 | n/a |
SJ0020 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $156 | $358 | n/a |
SJ0020 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,898 | $9,577 | n/a |
SJ0020 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $140,348 | $663,784 | n/a |
UL2403 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,803 | $0 | n/a |
UL2403 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $181 | $779 | n/a |
UL2403 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,568 | $3,839 | n/a |
UL2403 # 08 Y:2024 | 08 | 2024 | INSTALL SPECTRAL REFLECTORS / DELAMP | $680 | $0 | n/a |