Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
23
matching recommendationsSIC | 2491 | Wood Preserving |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0444 # 11 Y:2012 | 11 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $247 | $290 | Not Implemented |
WV0444 # 10 Y:2012 | 10 | 2012 | DEVELOP A REPAIR/REPLACE POLICY | $1,353 | $838 | Implemented |
WV0444 # 09 Y:2012 | 09 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,548 | $0 | Implemented |
WV0444 # 08 Y:2012 | 08 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,593 | $1,555 | Not Implemented |
WV0444 # 07 Y:2012 | 07 | 2012 | IMPROVE LUBRICATION PRACTICES | $1,688 | $500 | Implemented |
WV0444 # 06 Y:2012 | 06 | 2012 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,945 | $1,000 | Not Implemented |
WV0444 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,676 | $10,532 | Implemented |
WV0444 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,825 | $4,714 | Implemented |
WV0444 # 03 Y:2012 | 03 | 2012 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $2,848 | $1,560 | Not Implemented |
WV0444 # 02 Y:2012 | 02 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,137 | $15,286 | Implemented |
WV0444 # 01 Y:2012 | 01 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,498 | $8,040 | Not Implemented |
WV0250 # 12 Y:2002 | 12 | 2002 | INSTALL SENSORS TO DETECT DEFECTS | $11,505 | $13,600 | Not Implemented |
WV0250 # 01 Y:2002 | 01 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $718 | $230 | Not Implemented |
WV0250 # 11 Y:2002 | 11 | 2002 | CHANGE OPERATING CONDITIONS | $21,375 | $875 | Not Implemented |
WV0250 # 10 Y:2002 | 10 | 2002 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $900 | $665 | Not Implemented |
WV0250 # 09 Y:2002 | 09 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,056 | $3,735 | Not Implemented |
WV0250 # 08 Y:2002 | 08 | 2002 | REPLACE BOILER | $65,563 | $100,000 | Not Implemented |
WV0250 # 07 Y:2002 | 07 | 2002 | INSULATE BARE EQUIPMENT | $1,387 | $188 | Implemented |
WV0250 # 06 Y:2002 | 06 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $150 | $0 | Implemented |
WV0250 # 05 Y:2002 | 05 | 2002 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $4,266 | $300 | Implemented |
WV0250 # 04 Y:2002 | 04 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $765 | $30 | Implemented |
WV0250 # 03 Y:2002 | 03 | 2002 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,399 | $1,000 | Implemented |
WV0250 # 02 Y:2002 | 02 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,500 | $0 | Implemented |