IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

133

matching recommendations
Reset
SIC 25 Furniture And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0919 # 07 Y:2015 07 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $11,674 $0 Implemented
UD0919 # 08 Y:2015 08 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,715 $0 Implemented
UD0919 # 11 Y:2015 11 2015 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $242 $700 Not Implemented
UD0919 # 05 Y:2015 05 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $36,602 $22,000 Not Implemented
UD0919 # 10 Y:2015 10 2015 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $2,652 $5,000 Not Implemented
UD0919 # 12 Y:2015 12 2015 MAKE A NEW BY-PRODUCT $24,789 $46,000 Not Implemented
UD0919 # 09 Y:2015 09 2015 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $4,591 $4,300 Not Implemented
UD0919 # 02 Y:2015 02 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,792 $0 Implemented
UD0919 # 03 Y:2015 03 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,936 $50 Implemented
UD0919 # 06 Y:2015 06 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,496 $2,295 Not Implemented
UD0919 # 13 Y:2015 13 2015 CLEAN FOULING FROM WATER LINES REGULARLY $5,080 $2,750 Not Implemented
UD0759 # 04 Y:2007 04 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,276 $0 Implemented
UD0759 # 03 Y:2007 03 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $7,675 $0 Implemented
UD0759 # 09 Y:2007 09 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $173 $0 Not Implemented
UD0759 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $11,130 $0 Implemented
UD0759 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,549 $40,500 Not Implemented
UD0759 # 05 Y:2007 05 2007 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,440 $0 Implemented
UD0759 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $664 $500 Implemented
UD0759 # 07 Y:2007 07 2007 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $534 $0 Not Implemented
UD0759 # 08 Y:2007 08 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $266 $0 Not Implemented
UD0654 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $415 $200 Implemented
UD0654 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,416 $5,925 Not Implemented
UD0654 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,212 $0 Implemented
UD0654 # 03 Y:2002 03 2002 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,152 $2,800 Not Implemented
UD0654 # 01 Y:2002 01 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $12,000 $12,000 Not Implemented