Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,583
matching recommendationsSIC | 25 | Furniture And Fixtures |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CC0028 # 11 Y:2023 | 11 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $49,090 | $118,344 | n/a |
CC0028 # 10 Y:2023 | 10 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,953 | $4,760 | n/a |
CC0028 # 09 Y:2023 | 09 | 2023 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $12,193 | $75,000 | n/a |
CC0028 # 08 Y:2023 | 08 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,138 | $6,000 | n/a |
CC0028 # 07 Y:2023 | 07 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,053 | $18,871 | n/a |
CC0028 # 06 Y:2023 | 06 | 2023 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $7,824 | $12,573 | n/a |
CC0028 # 05 Y:2023 | 05 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,311 | $0 | n/a |
CC0028 # 04 Y:2023 | 04 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $8,063 | $20,000 | n/a |
CC0028 # 03 Y:2023 | 03 | 2023 | INSULATE BARE EQUIPMENT | $3,687 | $5,300 | n/a |
CC0028 # 02 Y:2023 | 02 | 2023 | INSULATE FEEDWATER TANK | $1,517 | $700 | n/a |
CC0028 # 01 Y:2023 | 01 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,157 | $3,110 | n/a |
MS0418 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,100 | $36,087 | Not Implemented |
MS0418 # 02 Y:2023 | 02 | 2023 | INSTALL OCCUPANCY SENSORS | $229 | $721 | Not Implemented |
MS0418 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,971 | $0 | Not Implemented |
LE0547 # 05 Y:2023 | 05 | 2023 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $6,147 | $30,000 | Not Implemented |
LE0547 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,448 | $13,930 | Implemented |
LE0547 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $602 | $1,720 | Implemented |
LE0547 # 02 Y:2023 | 02 | 2023 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $2,446 | $1,500 | Not Implemented |
LE0547 # 01 Y:2023 | 01 | 2023 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $846 | $400 | Implemented |
OK1086 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,012 | $1,489 | Implemented |
OK1086 # 02 Y:2023 | 02 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $630 | $330 | Implemented |
OK1086 # 03 Y:2023 | 03 | 2023 | USE RADIANT HEATER FOR SPOT HEATING | $8,472 | $13,560 | Not Implemented |
OK1086 # 04 Y:2023 | 04 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $31,948 | $382,200 | Not Implemented |
UU0212 # 06 Y:2023 | 06 | 2023 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $425 | $850 | Not Implemented |
UU0212 # 05 Y:2023 | 05 | 2023 | USE OPTIMUM THICKNESS INSULATION | $4,220 | $4,402 | Not Implemented |