IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,525

matching recommendations
Reset
SIC 25 Furniture And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0496 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $190 $0 Not Implemented
CO0496 # 05 Y:2001 05 2001 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $104,330 $20,000 Not Implemented
CO0496 # 06 Y:2001 06 2001 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $68,550 $3,360 Not Implemented
CO0496 # 07 Y:2001 07 2001 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $12,610 $0 Not Implemented
AS0313 # 01 Y:2001 01 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $2,092 $1,500 Implemented
AS0313 # 02 Y:2001 02 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $311 $1,254 Implemented
AS0313 # 03 Y:2001 03 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $44,929 $31,000 Not Implemented
AS0313 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,661 $180 Implemented
AS0313 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,639 $24,888 Implemented
AS0313 # 06 Y:2001 06 2001 INSTALL SKYLIGHTS $1,042 $8,108 Not Implemented
AS0313 # 07 Y:2001 07 2001 INSTALL OCCUPANCY SENSORS $71 $225 Not Implemented
AS0313 # 08 Y:2001 08 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,708 $735 Not Implemented
AS0313 # 09 Y:2001 09 2001 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $49,133 $8,028 Implemented
NC0227 # 01 Y:2001 01 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,391 $250 Not Implemented
NC0227 # 02 Y:2001 02 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $15,815 $30,000 Not Implemented
NC0227 # 03 Y:2001 03 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $662 $308 Not Implemented
NC0227 # 04 Y:2001 04 2001 IMPROVE COMBUSTION CONTROL CAPABILITY $89,586 $60,000 Not Implemented
NC0227 # 05 Y:2001 05 2001 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $30,612 $50,000 Not Implemented
NC0227 # 06 Y:2001 06 2001 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK $200,000 $35,000 Not Implemented
NC0227 # 07 Y:2001 07 2001 CONTROL PRESSURE ON STEAMER OPERATIONS $7,356 $7,500 Implemented
NC0227 # 08 Y:2001 08 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,500 $5,000 Not Implemented
NC0227 # 09 Y:2001 09 2001 ADJUST BURNERS FOR EFFICIENT OPERATION $17,577 $15,000 Not Implemented
NC0227 # 10 Y:2001 10 2001 DEVELOP A REPAIR/REPLACE POLICY $2,636 $4,205 Implemented
NC0227 # 11 Y:2001 11 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,277 $2,690 Not Implemented
NC0227 # 12 Y:2001 12 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $824 $1,210 Implemented