IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,525

matching recommendations
Reset
SIC 25 Furniture And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0136 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,673 $0 Implemented
SF0136 # 02 Y:1998 02 1998 ADD AREA LIGHTING SWITCHES $860 $90 Implemented
SF0136 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,521 $1,200 Not Implemented
SF0136 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $267 $233 Implemented
NC0134 # 02 Y:1998 02 1998 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $13,767 $61,000 Not Implemented
NC0134 # 03 Y:1998 03 1998 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,986 $1,000 Implemented
NC0134 # 04 Y:1998 04 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,793 $700 Implemented
NC0134 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $142 $300 Implemented
NC0134 # 06 Y:1998 06 1998 RECOVER WASTE HEAT FROM EQUIPMENT $1,413 $1,000 Not Implemented
NC0134 # 07 Y:1998 07 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,598 $6,669 Implemented
NC0134 # 08 Y:1998 08 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $20,000 $10,000 Implemented
NC0134 # 09 Y:1998 09 1998 CLEAR AND RENT EXISTING SPACE $30,000 $26,980 Implemented
WV0138 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $564 $2,195 Implemented
WV0138 # 02 Y:1998 02 1998 USE SYNTHETIC LUBRICANT $343 $254 Implemented
WV0138 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $865 $324 Not Implemented
WV0138 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $186 $112 Not Implemented
WV0138 # 05 Y:1998 05 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $515 $240 Implemented
WV0138 # 06 Y:1998 06 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $900 $3,830 Implemented
WV0138 # 07 Y:1998 07 1998 INSULATE BARE EQUIPMENT $4,520 $380 Not Implemented
WV0138 # 08 Y:1998 08 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,724 $0 Implemented
WV0138 # 09 Y:1998 09 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $3,429 $0 Implemented
WV0138 # 10 Y:1998 10 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $57,600 $272 Not Implemented
NC0134 # 01 Y:1998 01 1998 BURN A LESS EXPENSIVE GRADE OF FUEL $17,025 $30,000 Implemented
MS0104 # 01 Y:1998 01 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,476 $54 Implemented
MS0104 # 02 Y:1998 02 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $12,499 $3,080 Not Implemented