IAC logo
IAC Assessment: WI0337
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0337
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1999
Principal Product Specialty Contract Furniture
NAICS n/a
SIC 2521 - Wood Office Furniture
Sales $10,000,000-$50,000,000
# of Employees 190
Plant Area (Sq.Ft.) 252,319
Annual Production 14,000 Pieces
Production Hrs. Annual 2,375
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $100,613 3,885,991 kWh $0.03
Electricity Demand $111,945 15,830 kW-months/year $7.07
Electricity Fees $32,776 - $ -
Natural Gas $87,875 25,444 MMBtu $3.45
TOTAL ENERGY COSTS $362,674
RECOMMENDED SAVINGS* $98,691 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,196
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $ $ $
01: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$68,050
Cost:
$1,000
- - - - - - - - - - - - - - $68,050 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
$68,050
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$11,924
Cost:
$1,600
- - - - $11,924 3,456 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$11,924
3,456
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
03: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$5,222
Cost:
$5,700
$(-3) (-293) $(-25) (-3) - - - - - - $5,250 - - - - - $(-3)
(-293)
kWh
$(-25)
(-3)
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$5,250
-
$
-
-
$
-
-
$
04: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$3,492
Cost:
$6,000
- - - - - - $3,120 907 $(-717) (-435) $(-1,271) - - - $2,360 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,120
907
gal
$(-717)
(-435)
lb
$(-1,271)
-
$
-
-
$
$2,360
-
$
05: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$3,019
Cost:
$10,000
- - - - $(-200) (-58) $4,096 6,072 - - $(-877) - - - - - -
-
kWh
-
-
kW-months/year
$(-200)
(-58)
MMBtu
$4,096
6,072
gal
-
-
lb
$(-877)
-
$
-
-
$
-
-
$
06: 2.7314 REDUCE VENTILATION AIR Savings:
$2,871
Cost:
$500
$536 19,637 - - $2,335 677 - - - - - - - - - - $536
19,637
kWh
-
-
kW-months/year
$2,335
677
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,551
Cost:
-
$803 29,601 $748 101 - - - - - - - - - - - - $803
29,601
kWh
$748
101
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
08: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN Savings:
$990
Cost:
$5,024
$486 17,878 $504 68 - - - - - - - - - - - - $486
17,878
kWh
$504
68
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$433
Cost:
$640
$224 8,206 $209 28 - - - - - - - - - - - - $224
8,206
kWh
$209
28
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
10: 2.8112 COMBINE UTILITY METERS Savings:
$562
Cost:
$200
- - - - - - - - - - - - $562 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
$562
-
$
-
-
$
11: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$400
Cost:
$809
$213 7,913 $187 25 - - - - - - - - - - - - $213
7,913
kWh
$187
25
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$177
Cost:
$170
$97 3,517 $80 11 - - - - - - - - - - - - $97
3,517
kWh
$80
11
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$98,691
Cost:
$31,643
$2,356 86,459 $1,703 230 $14,059 4,075 $7,216 6,979 $(-717) (-435) $3,102 - $562 - $70,410 - $2,356
86,459
kWh
$1,703
230
kW-months/year
$14,059
4,075
MMBtu
$7,216
6,979
gal
$(-717)
(-435)
lb
$3,102
-
$
$562
-
$
$70,410
-
$
TOTAL IMPLEMENTED Savings:
$8,196
Cost:
$11,364
$1,510 55,392 $1,436 194 - - - - - - $5,250 - - - - - $1,510
55,392
kWh
$1,436
194
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$5,250
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material