IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

105

matching recommendations
Reset
SIC 25 Furniture And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0037 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $267 $0 Not Implemented
IP0037 # 01 Y:2015 01 2015 APPLY FOR INVESTMENT INCENTIVES $2,707 $0 Implemented
IP0037 # 12 Y:2015 12 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,962 $9,239 Not Implemented
IP0037 # 11 Y:2015 11 2015 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS $12,533 $21,055 Implemented
IP0037 # 10 Y:2015 10 2015 INSTALL OCCUPANCY SENSORS $518 $739 Not Implemented
IP0037 # 09 Y:2015 09 2015 RECOVER WASTE HEAT FROM EQUIPMENT $3,490 $1,421 Not Implemented
IP0037 # 08 Y:2015 08 2015 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $32,642 $7,996 Implemented
IP0037 # 07 Y:2015 07 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,192 $980 Not Implemented
IP0037 # 06 Y:2015 06 2015 INSULATE BARE EQUIPMENT $1,469 $211 Not Implemented
IP0037 # 05 Y:2015 05 2015 $1,364 $171 Not Implemented
IP0037 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,417 $113 Implemented
IP0037 # 03 Y:2015 03 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $14,074 $227 Implemented
IP0008 # 07 Y:2013 07 2013 INSTALL OCCUPANCY SENSORS $282 $107 Not Implemented
IP0008 # 02 Y:2013 02 2013 UPGRADE CONTROLS ON COMPRESSORS $3,853 $0 Implemented
IP0008 # 09 Y:2013 09 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $7,093 $15,665 Not Implemented
IP0008 # 10 Y:2013 10 2013 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $11,117 $33,000 Not Implemented
IP0008 # 08 Y:2013 08 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,510 $9,972 Implemented
IP0008 # 05 Y:2013 05 2013 INSULATE BARE EQUIPMENT $5,583 $900 Not Implemented
IP0008 # 06 Y:2013 06 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,117 $449 Not Implemented
IP0008 # 04 Y:2013 04 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,234 $0 Implemented
IP0008 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,703 $0 Implemented
IP0008 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,340 $0 Implemented
UD0772 # 12 Y:2007 12 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $530 $930 Not Implemented
UD0772 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,540 $58,765 Implemented
UD0772 # 08 Y:2007 08 2007 UPGRADE CONTROLS ON COMPRESSORS $7,421 $17,000 Implemented