IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

52

matching recommendations
Reset
SIC 25 Furniture And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0542 # 02 Y:2000 02 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,380 $600 Not Implemented
KU0542 # 01 Y:2000 01 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,290 $900 Not Implemented
KU0542 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,010 $330 Implemented
KU0542 # 04 Y:2000 04 2000 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,730 $0 Implemented
KU0542 # 05 Y:2000 05 2000 OPTIMIZE PLANT POWER FACTOR $980 $1,650 Not Implemented
KU0542 # 06 Y:2000 06 2000 RECOVER WASTE HEAT FROM EQUIPMENT $900 $2,400 Not Implemented
KU0542 # 07 Y:2000 07 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $650 $830 Not Implemented
KU0542 # 08 Y:2000 08 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $6,680 $2,150 Not Implemented
KU0542 # 09 Y:2000 09 2000 MINIMIZE WATER USAGE $1,560 $2,025 Not Implemented
KU0450 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $391 $660 Not Implemented
KU0450 # 07 Y:1995 07 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,310 $180 Implemented
KU0450 # 03 Y:1995 03 1995 INSTALL OCCUPANCY SENSORS $1,214 $1,970 Not Implemented
KU0450 # 02 Y:1995 02 1995 USE PHOTOCELL CONTROLS $3,753 $420 Not Implemented
KU0450 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,232 $34,320 Not Implemented
KU0450 # 12 Y:1995 12 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $984 $150 Implemented
KU0450 # 05 Y:1995 05 1995 METER WASTE WATER $2,463 $500 Not Implemented
KU0450 # 09 Y:1995 09 1995 INSULATE BARE EQUIPMENT $1,004 $2,184 Not Implemented
KU0450 # 11 Y:1995 11 1995 OPTIMIZE PLANT POWER FACTOR $2,417 $4,200 Not Implemented
KU0450 # 06 Y:1995 06 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,821 $232 Not Implemented
KU0450 # 08 Y:1995 08 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,246 $165 Implemented
KU0450 # 10 Y:1995 10 1995 TREAT AND REUSE RINSE WATERS $990 $3,850 Not Implemented
OK0435 # 01 Y:1994 01 1994 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,102 $7,500 Not Implemented
OK0435 # 02 Y:1994 02 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $374 $739 Not Implemented
OK0435 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $734 $0 Not Implemented
OK0435 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,461 $3,216 Not Implemented