Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
479
matching recommendationsSIC | 25 | Furniture And Fixtures |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CC0031 # 01 Y:2023 | 01 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,780 | $15,000 | n/a |
CC0031 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,100 | $3,000 | n/a |
CC0031 # 02 Y:2023 | 02 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $14,525 | $19,500 | n/a |
CC0031 # 03 Y:2023 | 03 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $34,115 | $205,795 | n/a |
CC0031 # 04 Y:2023 | 04 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $147 | $340 | n/a |
CC0031 # 05 Y:2023 | 05 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,751 | $0 | n/a |
CC0028 # 04 Y:2023 | 04 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $8,063 | $20,000 | n/a |
CC0028 # 11 Y:2023 | 11 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $49,090 | $118,344 | n/a |
CC0028 # 06 Y:2023 | 06 | 2023 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $7,824 | $12,573 | n/a |
CC0028 # 09 Y:2023 | 09 | 2023 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $12,193 | $75,000 | n/a |
CC0028 # 08 Y:2023 | 08 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,138 | $6,000 | n/a |
CC0028 # 05 Y:2023 | 05 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,311 | $0 | n/a |
CC0028 # 07 Y:2023 | 07 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,053 | $18,871 | n/a |
CC0028 # 03 Y:2023 | 03 | 2023 | INSULATE BARE EQUIPMENT | $3,687 | $5,300 | n/a |
CC0028 # 02 Y:2023 | 02 | 2023 | INSULATE FEEDWATER TANK | $1,517 | $700 | n/a |
CC0028 # 01 Y:2023 | 01 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,157 | $3,110 | n/a |
CC0028 # 10 Y:2023 | 10 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,953 | $4,760 | n/a |
NC0668 # 05 Y:2021 | 05 | 2021 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,271 | $22,000 | n/a |
NC0668 # 02 Y:2021 | 02 | 2021 | INSTALL OCCUPANCY SENSORS | $69 | $280 | n/a |
NC0668 # 04 Y:2021 | 04 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,843 | $6,325 | n/a |
NC0668 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,512 | $5,587 | n/a |
NC0668 # 03 Y:2021 | 03 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,314 | $8,000 | n/a |
NC0659 # 02 Y:2021 | 02 | 2021 | INSTALL OCCUPANCY SENSORS | $267 | $546 | n/a |
NC0659 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $502 | $100 | n/a |
NC0659 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,329 | $12,820 | n/a |