Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
40
matching recommendationsSIC | 25 | Furniture And Fixtures |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0212 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $4,400 | $9,000 | Not Implemented |
UU0213 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $1,190 | $3,000 | Not Implemented |
UU0213 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,602 | $1,773 | Not Implemented |
UU0213 # 02 Y:2023 | 02 | 2023 | INSTALL OCCUPANCY SENSORS | $5,181 | $18,250 | Not Implemented |
UU0213 # 01 Y:2023 | 01 | 2023 | USE POWER DURING OFF-PEAK PERIODS | $7,487 | $8,000 | Not Implemented |
UU0212 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $382 | $1,370 | Not Implemented |
UU0212 # 06 Y:2023 | 06 | 2023 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $425 | $850 | Not Implemented |
UU0213 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $639 | $1,950 | Not Implemented |
UU0212 # 05 Y:2023 | 05 | 2023 | USE OPTIMUM THICKNESS INSULATION | $4,220 | $4,402 | Not Implemented |
UU0212 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,326 | $21,555 | Not Implemented |
UU0212 # 02 Y:2023 | 02 | 2023 | REPLACE BOILER | $11,580 | $80,000 | Not Implemented |
UU0212 # 01 Y:2023 | 01 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $15,149 | $8,500 | Not Implemented |
UU0210 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $2,831 | $5,286 | Implemented |
UU0210 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $3,114 | $6,718 | Not Implemented |
UU0210 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,954 | $9,928 | Implemented |
UU0210 # 02 Y:2023 | 02 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $8,161 | $100 | Implemented |
UU0210 # 01 Y:2023 | 01 | 2023 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $12,345 | $2,500 | Implemented |
UU0210 # 07 Y:2023 | 07 | 2023 | SHADE WINDOWS FROM SUMMER SUN | $56 | $240 | Implemented |
UU0210 # 06 Y:2023 | 06 | 2023 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $1,582 | $2,500 | Implemented |
UU0085 # 04 Y:2005 | 04 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,090 | $21,620 | Not Implemented |
UU0085 # 05 Y:2005 | 05 | 2005 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $1,300 | $940 | Not Implemented |
UU0085 # 06 Y:2005 | 06 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $390 | $1,300 | Not Implemented |
UU0085 # 07 Y:2005 | 07 | 2005 | INSULATE FEEDWATER TANK | $150 | $200 | Not Implemented |
UU0085 # 03 Y:2005 | 03 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,110 | $405 | Not Implemented |
UU0085 # 02 Y:2005 | 02 | 2005 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,960 | $600 | Not Implemented |