IAC logo
IAC Assessment: UU0212
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0212
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2023
Principal Product Folding Chairs
NAICS 337127 - Institutional Furniture Manufacturing
SIC 2531 - Public Building & Related Furniture
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 100,000
Annual Production 320,000 Units
Production Hrs. Annual 4,680
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $59,788 1,655,879 kWh $0.04
Electricity Demand $134,263 8,267 kW-months/year $16.24
Electricity Fees $29,117 - $ -
Natural Gas $88,369 10,537 MMBtu $8.39
TOTAL ENERGY COSTS $311,537
RECOMMENDED SAVINGS* $44,482 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$15,149
Cost:
$8,500
$3,456 96,000 $11,693 720 - - - - - - $3,456
96,000
kWh
$11,693
720
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
02: 2.1224 REPLACE BOILER Savings:
$11,580
Cost:
$80,000
- - - - - - $7,005 835 $4,575 - -
-
kWh
-
-
kW-months/year
-
-
$
$7,005
835
MMBtu
$4,575
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,326
Cost:
$21,555
$4,068 112,989 $4,258 262 - - - - - - $4,068
112,989
kWh
$4,258
262
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,400
Cost:
$9,000
- - - - $4,400 - - - - - -
-
kWh
-
-
kW-months/year
$4,400
-
$
-
-
MMBtu
-
-
$
05: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$4,220
Cost:
$4,402
- - - - - - $4,220 503 - - -
-
kWh
-
-
kW-months/year
-
-
$
$4,220
503
MMBtu
-
-
$
06: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$425
Cost:
$850
- - - - - - $425 51 - - -
-
kWh
-
-
kW-months/year
-
-
$
$425
51
MMBtu
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$382
Cost:
$1,370
$382 10,624 - - - - - - - - $382
10,624
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$44,482
Cost:
$125,677
$7,906 219,613 $15,951 982 $4,400 - $11,650 1,389 $4,575 - $7,906
219,613
kWh
$15,951
982
kW-months/year
$4,400
-
$
$11,650
1,389
MMBtu
$4,575
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost