IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

84

matching recommendations
Reset
SIC 25 Furniture And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0355 # 06 Y:1988 06 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,943 $1,220 Implemented
GT0361 # 06 Y:1988 06 1988 RECOVER WASTE HEAT FROM EQUIPMENT $2,460 $2,000 Not Implemented
GT0361 # 05 Y:1988 05 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $202 $518 Not Implemented
GT0361 # 04 Y:1988 04 1988 USE MINIMUM SAFE OVEN VENTILATION $2,080 $250 Not Implemented
GT0361 # 03 Y:1988 03 1988 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $260 $450 Not Implemented
GT0361 # 02 Y:1988 02 1988 INSULATE BARE EQUIPMENT $7,330 $2,140 Not Implemented
GT0361 # 01 Y:1988 01 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $530 $50 Not Implemented
WI0044 # 04 Y:1988 04 1988 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $1,677 $1,500 Implemented
WI0044 # 01 Y:1988 01 1988 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,109 $1,400 Implemented
WI0044 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $805 $263 Implemented
TN0355 # 07 Y:1988 07 1988 DISCONNECT BALLASTS $1,320 $2,321 Implemented
TN0355 # 09 Y:1988 09 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,046 $360 Not Implemented
WI0044 # 02 Y:1988 02 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $221 $500 Not Implemented
TN0355 # 08 Y:1988 08 1988 IMPROVE LUBRICATION PRACTICES $1,071 $0 Implemented
TN0355 # 01 Y:1988 01 1988 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,038 $18,500 Not Implemented
TN0355 # 05 Y:1988 05 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,400 $0 Implemented
TN0355 # 02 Y:1988 02 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,104 $750 Implemented
TN0355 # 04 Y:1988 04 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,015 $4,840 Implemented
TN0355 # 03 Y:1988 03 1988 KEEP LAMPS AND REFLECTORS CLEAN $9,501 $19,134 Not Implemented
AT0116 # 07 Y:1988 07 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $460 $500 Implemented
AT0118 # 01 Y:1988 01 1988 USE DEMAND CONTROLLER OR LOAD SHEDDER $8,515 $2,000 Not Implemented
AT0118 # 02 Y:1988 02 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,258 $11,200 Implemented
AT0116 # 06 Y:1988 06 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,351 $450 Implemented
AT0116 # 05 Y:1988 05 1988 IMPROVE LUBRICATION PRACTICES $434 $0 Implemented
AT0116 # 04 Y:1988 04 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,324 $0 Implemented