Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
49
matching recommendationsSIC | 25 | Furniture And Fixtures |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
RU0073 # 07 Y:1989 | 07 | 1989 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,530 | $44,000 | Not Implemented |
RU0073 # 06 Y:1989 | 06 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $278 | $0 | Implemented |
RU0073 # 05 Y:1989 | 05 | 1989 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,635 | $645 | Implemented |
RU0073 # 04 Y:1989 | 04 | 1989 | AIR CONDITION ONLY SPACE NECESSARY | $846 | $0 | Not Implemented |
RU0073 # 03 Y:1989 | 03 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,227 | $2,028 | Implemented |
RU0073 # 02 Y:1989 | 02 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,131 | $325 | Implemented |
RU0073 # 01 Y:1989 | 01 | 1989 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,457 | $450 | Not Implemented |
TN0382 # 11 Y:1989 | 11 | 1989 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $137 | $490 | Implemented |
TN0382 # 05 Y:1989 | 05 | 1989 | RECOVER WASTE HEAT FROM EQUIPMENT | $438 | $1,850 | Implemented |
TN0382 # 04 Y:1989 | 04 | 1989 | INSTALL TIMERS AND/OR THERMOSTATS | $1,354 | $0 | Implemented |
TN0382 # 03 Y:1989 | 03 | 1989 | INSULATE BARE EQUIPMENT | $394 | $1,154 | Implemented |
TN0382 # 02 Y:1989 | 02 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,767 | $300 | Not Implemented |
TN0382 # 01 Y:1989 | 01 | 1989 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,396 | $600 | Implemented |
TN0382 # 06 Y:1989 | 06 | 1989 | INSTALL SET-BACK TIMERS | $707 | $0 | Implemented |
TN0382 # 10 Y:1989 | 10 | 1989 | DISCONNECT BALLASTS | $137 | $221 | Implemented |
TN0382 # 07 Y:1989 | 07 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $530 | $1,250 | Implemented |
TN0382 # 09 Y:1989 | 09 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $354 | $900 | Implemented |
TN0382 # 08 Y:1989 | 08 | 1989 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $115 | $600 | Implemented |
WI0058 # 11 Y:1989 | 11 | 1989 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $639 | $0 | Not Implemented |
WI0058 # 07 Y:1989 | 07 | 1989 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,585 | $1,500 | Implemented |
WI0058 # 06 Y:1989 | 06 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,523 | $0 | Implemented |
WI0058 # 05 Y:1989 | 05 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,077 | $500 | Implemented |
WI0058 # 04 Y:1989 | 04 | 1989 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,645 | $4,200 | Not Implemented |
WI0058 # 03 Y:1989 | 03 | 1989 | IMPROVE LUBRICATION PRACTICES | $7,226 | $0 | Implemented |
WI0058 # 02 Y:1989 | 02 | 1989 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,185 | $20,000 | Not Implemented |