IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

183

matching recommendations
Reset
SIC 25 Furniture And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0203 # 02 Y:2002 02 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $30,947 $16,790 Implemented
MS0203 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $5,201 $427 Not Implemented
MS0203 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,736 $1,189 Implemented
MS0203 # 05 Y:2002 05 2002 OPTIMIZE PLANT POWER FACTOR $4,266 $3,600 Implemented
MS0203 # 06 Y:2002 06 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $286 $375 Not Implemented
UF0292 # 01 Y:2002 01 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,946 $24,472 Implemented
UF0292 # 02 Y:2002 02 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $7,392 $6,547 Implemented
UF0292 # 03 Y:2002 03 2002 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,788 $50 Implemented
UF0292 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,347 $350 Implemented
UF0292 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $587 $0 Implemented
UF0292 # 06 Y:2002 06 2002 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $46,032 $4,000 Implemented
UF0292 # 07 Y:2002 07 2002 CONTRACT A WOOD PALLET RECYCLING COMPANY $468 $0 Implemented
UF0292 # 08 Y:2002 08 2002 $2,808 $876 Not Implemented
UF0292 # 09 Y:2002 09 2002 $11,250 $24,938 Implemented
UF0292 # 10 Y:2002 10 2002 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $140,438 $39,000 Implemented
WV0232 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $884 $150 Implemented
WV0232 # 02 Y:2002 02 2002 RECOVER WASTE HEAT FROM EQUIPMENT $3,821 $1,000 Not Implemented
WV0232 # 03 Y:2002 03 2002 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $2,127 $1,155 Implemented
WV0232 # 04 Y:2002 04 2002 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,818 $300 Implemented
WV0232 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $706 $148 Not Implemented
WV0232 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $689 $20 Implemented
WV0232 # 07 Y:2002 07 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $907 $480 Implemented
WV0232 # 08 Y:2002 08 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,088 $2,680 Not Implemented
WV0232 # 09 Y:2002 09 2002 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $11,788 $0 Implemented
WV0232 # 10 Y:2002 10 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,421 $0 Implemented