IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,606

matching recommendations
Reset
SIC 251 Household Furniture
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0210 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,984 $450 Implemented
UM0210 # 05 Y:2002 05 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $778 $900 Implemented
MS0203 # 01 Y:2002 01 2002 RECOVER WASTE HEAT FROM EQUIPMENT $7,097 $6,416 Not Implemented
MS0203 # 02 Y:2002 02 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $30,947 $16,790 Implemented
MS0203 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $5,201 $427 Not Implemented
MS0203 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,736 $1,189 Implemented
MS0203 # 05 Y:2002 05 2002 OPTIMIZE PLANT POWER FACTOR $4,266 $3,600 Implemented
MS0203 # 06 Y:2002 06 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $286 $375 Not Implemented
WI0410 # 08 Y:2002 08 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $942 $740 Implemented
WI0410 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,255 $7,140 Not Implemented
WI0410 # 06 Y:2002 06 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,015 $1,657 Implemented
WI0410 # 05 Y:2002 05 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,885 $20,800 Not Implemented
WI0410 # 04 Y:2002 04 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,636 $1,050 Not Implemented
WI0410 # 03 Y:2002 03 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,443 $0 Not Implemented
WI0410 # 02 Y:2002 02 2002 INSTALL TIMERS AND/OR THERMOSTATS $5,395 $600 Implemented
WI0410 # 01 Y:2002 01 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,178 $4,800 Implemented
AS0313 # 01 Y:2001 01 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $2,092 $1,500 Implemented
AS0313 # 02 Y:2001 02 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $311 $1,254 Implemented
AS0313 # 03 Y:2001 03 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $44,929 $31,000 Not Implemented
AS0313 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,661 $180 Implemented
AS0313 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,639 $24,888 Implemented
AS0313 # 06 Y:2001 06 2001 INSTALL SKYLIGHTS $1,042 $8,108 Not Implemented
AS0313 # 07 Y:2001 07 2001 INSTALL OCCUPANCY SENSORS $71 $225 Not Implemented
AS0313 # 08 Y:2001 08 2001 $2,708 $735 Not Implemented
AS0313 # 09 Y:2001 09 2001 $49,133 $8,028 Implemented