Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsSIC | 251 | Household Furniture |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0485 # 04 Y:2017 | 04 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,035 | $2,500 | n/a |
UM0485 # 03 Y:2017 | 03 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,888 | $3,500 | n/a |
UM0485 # 02 Y:2017 | 02 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $812 | $1,500 | n/a |
UM0485 # 01 Y:2017 | 01 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,536 | $1,000 | n/a |
UMS012 # 02 Y:2012 | 02 | 2012 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $553,000 | $750,000 | Not Implemented |
UMS012 # 01 Y:2012 | 01 | 2012 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $347,000 | $600,000 | Not Implemented |
UM0210 # 04 Y:2002 | 04 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,984 | $450 | Implemented |
UM0210 # 05 Y:2002 | 05 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $778 | $900 | Implemented |
UM0210 # 03 Y:2002 | 03 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,037 | $6,600 | Implemented |
UM0210 # 02 Y:2002 | 02 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,296 | $45,826 | n/a |
UM0210 # 01 Y:2002 | 01 | 2002 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $43,964 | $148,000 | Implemented |
UM0134 # 01 Y:1999 | 01 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,206 | $1,000 | Not Implemented |
UM0134 # 02 Y:1999 | 02 | 1999 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $11,967 | $2,000 | Not Implemented |
UM0134 # 03 Y:1999 | 03 | 1999 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $27,764 | $36,550 | Not Implemented |
UM0134 # 04 Y:1999 | 04 | 1999 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $1,800 | $0 | Not Implemented |
UM0134 # 05 Y:1999 | 05 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $944,916 | $200,000 | Not Implemented |
ND0160 # 06 Y:1993 | 06 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $70 | $100 | Implemented |
ND0160 # 05 Y:1993 | 05 | 1993 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $830 | $250 | Implemented |
ND0160 # 04 Y:1993 | 04 | 1993 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,610 | $1,350 | Not Implemented |
ND0160 # 03 Y:1993 | 03 | 1993 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $488 | $1,250 | Implemented |
ND0160 # 02 Y:1993 | 02 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,871 | $330 | Implemented |
ND0160 # 01 Y:1993 | 01 | 1993 | RECOVER AND REUSE COOLING WATER | $7,900 | $18,500 | Not Implemented |
ND0031 # 01 Y:1992 | 01 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,015 | $23,670 | Implemented |
ND0031 # 04 Y:1992 | 04 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $192 | $320 | Not Implemented |
ND0031 # 03 Y:1992 | 03 | 1992 | OPTIMIZE PLANT POWER FACTOR | $4,422 | $10,437 | Not Implemented |