IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

667

matching recommendations
Reset
SIC 2511 Wood Household Furniture
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CC0031 # 05 Y:2023 05 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,751 $0 n/a
CC0031 # 04 Y:2023 04 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $147 $340 n/a
CC0031 # 01 Y:2023 01 2023 RECOVER WASTE HEAT FROM EQUIPMENT $12,780 $15,000 n/a
CC0031 # 02 Y:2023 02 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $14,525 $19,500 n/a
CC0031 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,100 $3,000 n/a
CC0031 # 03 Y:2023 03 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $34,115 $205,795 n/a
CC0028 # 04 Y:2023 04 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $8,063 $20,000 n/a
CC0028 # 06 Y:2023 06 2023 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $7,824 $12,573 n/a
CC0028 # 11 Y:2023 11 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $49,090 $118,344 n/a
CC0028 # 10 Y:2023 10 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,953 $4,760 n/a
CC0028 # 09 Y:2023 09 2023 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $12,193 $75,000 n/a
CC0028 # 08 Y:2023 08 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,138 $6,000 n/a
CC0028 # 07 Y:2023 07 2023 RECOVER WASTE HEAT FROM EQUIPMENT $5,053 $18,871 n/a
CC0028 # 02 Y:2023 02 2023 INSULATE FEEDWATER TANK $1,517 $700 n/a
CC0028 # 03 Y:2023 03 2023 INSULATE BARE EQUIPMENT $3,687 $5,300 n/a
CC0028 # 05 Y:2023 05 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,311 $0 n/a
CC0028 # 01 Y:2023 01 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,157 $3,110 n/a
MI0370 # 03 Y:2020 03 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,446 $2,260 Not Implemented
MI0370 # 05 Y:2020 05 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,983 $580 Implemented
MI0370 # 02 Y:2020 02 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $10,944 $53,621 Not Implemented
MI0370 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,663 $120 Implemented
MI0370 # 07 Y:2020 07 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $4,066 $480 Implemented
MI0370 # 01 Y:2020 01 2020 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $15,466 $26,940 Not Implemented
MI0370 # 08 Y:2020 08 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,834 $1,980 Implemented
MI0370 # 04 Y:2020 04 2020 UPGRADE CONTROLS ON COMPRESSORS $7,381 $10,120 Not Implemented