IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
SIC 2511 Wood Household Furniture
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0472 # 01 Y:2000 01 2000 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,280 $12,550 Implemented
CO0472 # 02 Y:2000 02 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,960 $200 Not Implemented
CO0472 # 03 Y:2000 03 2000 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,040 $1,000 Implemented
CO0472 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $570 $370 Implemented
CO0472 # 05 Y:2000 05 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $410 $1,020 Implemented
CO0472 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $130 $0 Not Implemented
CO0472 # 07 Y:2000 07 2000 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $35,000 $1,600 Implemented
GT0697 # 09 Y:2000 09 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $912 $2,880 Implemented
GT0697 # 08 Y:2000 08 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,770 $900 Not Implemented
GT0697 # 07 Y:2000 07 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $19,000 $3,800 Implemented
GT0697 # 06 Y:2000 06 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,480 $26,340 Not Implemented
GT0697 # 05 Y:2000 05 2000 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $5,825 $2,850 Implemented
GT0697 # 04 Y:2000 04 2000 INSTALL SENSORS TO DETECT DEFECTS $38,825 $600 Implemented
GT0697 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,700 $37,500 Not Implemented
GT0697 # 02 Y:2000 02 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,208 $4,355 Not Implemented
GT0697 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,385 $46,235 Implemented
MS0164 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,436 $604 Implemented
MS0164 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $332 $124 Not Implemented
MS0164 # 03 Y:2000 03 2000 INSTALL TIMERS AND/OR THERMOSTATS $1,352 $355 Not Implemented
MS0164 # 04 Y:2000 04 2000 DISCONNECT BALLASTS $1,506 $876 Implemented
MS0164 # 05 Y:2000 05 2000 USE SYNTHETIC LUBRICANT $1,686 $1,686 Implemented
MS0164 # 06 Y:2000 06 2000 INSULATE BARE EQUIPMENT $259 $196 Not Implemented
MS0154 # 01 Y:2000 01 2000 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,846 $0 Implemented
MS0154 # 02 Y:2000 02 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,801 $709 Not Implemented
MS0154 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $188 $205 Not Implemented