IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 2511 Wood Household Furniture
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0142 # 07 Y:2002 07 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $632 $700 Not Implemented
SU0142 # 06 Y:2002 06 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,095 $0 Not Implemented
SU0142 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,062 $0 Not Implemented
SU0142 # 04 Y:2002 04 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,958 $230 Implemented
SU0142 # 01 Y:2002 01 2002 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $301,334 $2,109,900 Not Implemented
SU0142 # 02 Y:2002 02 2002 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $42,602 $19,900 Implemented
SU0142 # 03 Y:2002 03 2002 OPTIMIZE PLANT POWER FACTOR $9,118 $3,100 Not Implemented
NC0240 # 01 Y:2002 01 2002 KEEP BOILER TUBES CLEAN $12,204 $10,000 Implemented
NC0240 # 02 Y:2002 02 2002 DEVELOP A REPAIR/REPLACE POLICY $673 $1,146 Implemented
NC0240 # 03 Y:2002 03 2002 USE PHOTOCELL CONTROLS $118 $200 Implemented
NC0240 # 04 Y:2002 04 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $132 $60 Implemented
NC0240 # 05 Y:2002 05 2002 CHECK FOR ACCURACY OF UTILITY / POWER METERS $3,000 $1,000 Implemented
NC0240 # 06 Y:2002 06 2002 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $100,000 $200,000 Implemented
NC0239 # 02 Y:2002 02 2002 DEVELOP A REPAIR/REPLACE POLICY $614 $3,190 Implemented
NC0239 # 05 Y:2002 05 2002 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $11,025 $6,500 Not Implemented
NC0239 # 04 Y:2002 04 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,119 $15,000 Not Implemented
NC0239 # 03 Y:2002 03 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $132 $60 Implemented
NC0239 # 01 Y:2002 01 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,731 $15,000 Not Implemented
UM0210 # 01 Y:2002 01 2002 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $43,964 $148,000 Implemented
UM0210 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,296 $45,826 n/a
UM0210 # 03 Y:2002 03 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,037 $6,600 Implemented
UM0210 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,984 $450 Implemented
UM0210 # 05 Y:2002 05 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $778 $900 Implemented