IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

164

matching recommendations
Reset
SIC 2514 Metal Household Furniture
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0568 # 09 Y:2024 09 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,779 $78,580 n/a
LE0568 # 07 Y:2024 07 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $684 $950 n/a
LE0568 # 05 Y:2024 05 2024 INSULATE BARE EQUIPMENT $1,730 $1,215 n/a
LE0568 # 08 Y:2024 08 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,570 $9,661 n/a
LE0568 # 03 Y:2024 03 2024 INSTALL TIMERS AND/OR THERMOSTATS $6,769 $1,120 n/a
LE0568 # 06 Y:2024 06 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,295 $12,500 n/a
LE0568 # 02 Y:2024 02 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,890 $200 n/a
LE0568 # 01 Y:2024 01 2024 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,304 $0 n/a
LE0568 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,155 $1,400 n/a
MI0372 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,103 $21,302 Implemented
MI0372 # 06 Y:2020 06 2020 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,113 $2,041 Not Implemented
MI0372 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $1,658 $2,091 Not Implemented
MI0372 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,674 $120 Implemented
MI0372 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,282 $1,980 Implemented
MI0372 # 02 Y:2020 02 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,241 $20,434 Not Implemented
UM0485 # 04 Y:2017 04 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,035 $2,500 n/a
UM0485 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,536 $1,000 n/a
UM0485 # 02 Y:2017 02 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $812 $1,500 n/a
UM0485 # 03 Y:2017 03 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,888 $3,500 n/a
SD0483 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,147 $500 Implemented
SD0483 # 01 Y:2014 01 2014 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $18,026 $61,400 Implemented
SD0483 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,633 $2,600 Implemented
SD0483 # 02 Y:2014 02 2014 INSULATE BARE EQUIPMENT $7,108 $21,254 Not Implemented
SD0483 # 07 Y:2014 07 2014 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $783 $500 Implemented
SD0483 # 05 Y:2014 05 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,563 $3,243 Implemented