IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 2514 Metal Household Furniture
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0372 # 06 Y:2020 06 2020 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,113 $2,041 Not Implemented
MI0372 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $1,658 $2,091 Not Implemented
MI0372 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,674 $120 Implemented
MI0372 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,282 $1,980 Implemented
MI0372 # 02 Y:2020 02 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,241 $20,434 Not Implemented
MI0372 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,103 $21,302 Implemented
MI0118 # 02 Y:2005 02 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,966 $4,628 Not Implemented
MI0118 # 06 Y:2005 06 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,808 $84 Not Implemented
MI0118 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,613 $56 Not Implemented
MI0118 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,896 $862 Not Implemented
MI0118 # 03 Y:2005 03 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,306 $65 Not Implemented
MI0118 # 01 Y:2005 01 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $14,993 $9,230 Not Implemented
MI0118 # 07 Y:2005 07 2005 $1,061 $0 Not Implemented
UF0067 # 11 Y:1993 11 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $736 $2,600 Not Implemented
UF0067 # 10 Y:1993 10 1993 INSTALL TIMERS AND/OR THERMOSTATS $745 $2,205 Not Implemented
UF0067 # 09 Y:1993 09 1993 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $528 $1,070 Not Implemented
UF0067 # 08 Y:1993 08 1993 INSTALL OCCUPANCY SENSORS $667 $256 Not Implemented
UF0067 # 07 Y:1993 07 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,010 $8,108 Not Implemented
UF0067 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $908 $1,386 Implemented
UF0067 # 05 Y:1993 05 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,005 $2,000 Not Implemented
UF0067 # 04 Y:1993 04 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $347 $675 Not Implemented
UF0067 # 03 Y:1993 03 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $522 $705 Not Implemented
UF0067 # 02 Y:1993 02 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,583 $4,808 Implemented
UF0067 # 01 Y:1993 01 1993 USE POWER DURING OFF-PEAK PERIODS $3,864 $0 Not Implemented