IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

248

matching recommendations
Reset
SIC 2515 Mattresses And Bedsprings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0747 # 04 Y:2007 04 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,099 $0 Not Implemented
OK0747 # 05 Y:2007 05 2007 USE SOLAR HEAT FOR HEAT $14,978 $138,320 Not Implemented
OK0747 # 06 Y:2007 06 2007 INSTALL SKYLIGHTS $22,903 $139,000 Not Implemented
OK0747 # 07 Y:2007 07 2007 $2,068 $200 Not Implemented
AS0386 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,031 $120 Implemented
AS0386 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,011 $15 Implemented
AS0386 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $639 $1,350 Implemented
AS0386 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $205 $254 Not Implemented
AS0386 # 05 Y:2004 05 2004 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $7,680 $2,000 Not Implemented
AS0386 # 06 Y:2004 06 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $437 $850 Not Implemented
AS0386 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,758 $35,730 Implemented
MS0245 # 01 Y:2004 01 2004 PREHEAT COMBUSTION AIR WITH WASTE HEAT $82,017 $6,780 Not Implemented
MS0245 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,496 $15,583 Not Implemented
MS0245 # 03 Y:2004 03 2004 REPLACE BOILER $6,523 $4,642 Not Implemented
MS0245 # 04 Y:2004 04 2004 USE PHOTOCELL CONTROLS $3,354 $1,036 Not Implemented
MS0245 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,071 $156 Implemented
MS0245 # 06 Y:2004 06 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,263 $1,542 Not Implemented
MS0245 # 07 Y:2004 07 2004 INSTALL TIMERS AND/OR THERMOSTATS $216 $355 Not Implemented
MS0245 # 08 Y:2004 08 2004 DISCONNECT BALLASTS $93 $180 Implemented
GT0737 # 01 Y:2002 01 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,238 $5,018 Implemented
GT0737 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $193 $330 Not Implemented
GT0737 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $170 $0 Not Implemented
GT0737 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $715 $2,240 Implemented
GT0737 # 05 Y:2002 05 2002 ELIMINATE/REDUCE AN OPERATION $530 $675 Not Implemented
GT0737 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,105 $4,013 Implemented