IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
Reset
SIC 2515 Mattresses And Bedsprings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0108 # 04 Y:2013 04 2013 REPAIR AND ELIMINATE STEAM LEAKS $4,000 $980 Implemented
TT0108 # 03 Y:2013 03 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,110 $1,110 Not Implemented
TT0108 # 02 Y:2013 02 2013 CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS $5,367 $8,075 Not Implemented
TT0108 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,126 $10,709 Implemented
MZ0102 # 02 Y:2012 02 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,776 $10,060 Not Implemented
MZ0102 # 06 Y:2012 06 2012 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $2,370 $2,270 Implemented
MZ0102 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,326 $16,800 Implemented
MZ0102 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,444 $0 Implemented
MZ0102 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,327 $2,000 Implemented
MZ0102 # 01 Y:2012 01 2012 INSTALL OCCUPANCY SENSORS $930 $700 Implemented
TN0299 # 01 Y:1987 01 1987 INSULATE BARE EQUIPMENT $1,498 $429 Implemented
TN0299 # 02 Y:1987 02 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,301 $2,000 Implemented
TN0299 # 03 Y:1987 03 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,747 $165 Implemented
TN0299 # 04 Y:1987 04 1987 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $453 $1,192 Implemented
TN0299 # 05 Y:1987 05 1987 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,674 $930 Not Implemented
TN0299 # 06 Y:1987 06 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,555 $1,600 Not Implemented
TN0299 # 07 Y:1987 07 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,335 $360 Not Implemented
TN0299 # 08 Y:1987 08 1987 INSTALL SET-BACK TIMERS $1,176 $0 Implemented