IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

64

matching recommendations
Reset
SIC 2519 Household Furniture, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0162 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,349 $0 Implemented
SU0162 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,363 $221 Implemented
SU0162 # 02 Y:2003 02 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,701 $33,700 Not Implemented
SU0162 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $10,022 $350 Implemented
SU0162 # 01 Y:2003 01 2003 $115,150 $12,371 Implemented
SU0162 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $538 $134 Implemented
LM0043 # 06 Y:2002 06 2002 $27,000 $19,260 Not Implemented
LM0043 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,494 $2,354 Not Implemented
LM0043 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,002 $250 Implemented
LM0043 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,510 $1,365 Implemented
LM0043 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,618 $910 Not Implemented
LM0043 # 05 Y:2002 05 2002 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $284 $331 Not Implemented
LM0038 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,190 $90 Implemented
LM0038 # 03 Y:2002 03 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,662 $1,100 Implemented
LM0038 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,001 $200 Implemented
LM0038 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $337 $250 Implemented
LM0038 # 05 Y:2002 05 2002 ADD AREA LIGHTING SWITCHES $898 $800 Implemented
LM0038 # 07 Y:2002 07 2002 $39,000 $20,250 Not Implemented
LM0038 # 08 Y:2002 08 2002 $22,500 $1,000 Not Implemented
LM0038 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,602 $60 Implemented
UD0551 # 03 Y:1998 03 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,400 $7,000 Not Implemented
UD0551 # 04 Y:1998 04 1998 $1,083 $225 Implemented
UD0551 # 01 Y:1998 01 1998 $42,000 $2,400 Not Implemented
UD0551 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,897 $10,073 Implemented
TN0573 # 03 Y:1996 03 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,596 $7,980 Not Implemented