Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsSIC | 252 | Office Furniture |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0169 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,846 | $7,106 | Not Implemented |
SU0169 # 05 Y:2003 | 05 | 2003 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $10,608 | $9,520 | Not Implemented |
SU0169 # 01 Y:2003 | 01 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,694 | $0 | Implemented |
SU0169 # 02 Y:2003 | 02 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $53,040 | $348 | Implemented |
SU0169 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,194 | $26 | Implemented |
SU0169 # 04 Y:2003 | 04 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $494 | $168 | Implemented |
MS0228 # 05 Y:2003 | 05 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $323 | $0 | Implemented |
MS0228 # 01 Y:2003 | 01 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,861 | $6,210 | Not Implemented |
MS0228 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,344 | $276 | Implemented |
MS0228 # 06 Y:2003 | 06 | 2003 | INSULATE BARE EQUIPMENT | $90 | $157 | Not Implemented |
MS0228 # 03 Y:2003 | 03 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,499 | $2,540 | Implemented |
MS0228 # 04 Y:2003 | 04 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,237 | $1,210 | Not Implemented |
TA0055 # 03 Y:2003 | 03 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $14,100 | $46 | Implemented |
TA0055 # 10 Y:2003 | 10 | 2003 | COVER OPEN TANKS | $100 | $0 | Implemented |
TA0055 # 09 Y:2003 | 09 | 2003 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $290 | $0 | Not Implemented |
TA0055 # 08 Y:2003 | 08 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $535 | $985 | Not Implemented |
TA0055 # 07 Y:2003 | 07 | 2003 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $1,675 | $1,000 | Implemented |
TA0055 # 06 Y:2003 | 06 | 2003 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $5,260 | $2,000 | Not Implemented |
TA0055 # 05 Y:2003 | 05 | 2003 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $9,360 | $0 | Implemented |
TA0055 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,400 | $910 | Implemented |
TA0055 # 02 Y:2003 | 02 | 2003 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $36,000 | $31,820 | Implemented |
TA0055 # 01 Y:2003 | 01 | 2003 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $68,000 | $0 | Implemented |
MI0052 # 01 Y:2003 | 01 | 2003 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $14,442 | $372 | Not Implemented |
MI0052 # 04 Y:2003 | 04 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,165 | $3,837 | Implemented |
MI0052 # 03 Y:2003 | 03 | 2003 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $30,699 | $1,000 | Not Implemented |