IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

307

matching recommendations
Reset
SIC 2541 Wood Partitions And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0091 # 01 Y:1996 01 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,684 $11,906 Not Implemented
SF0091 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $913 $3,000 Implemented
SF0091 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $221 $281 Implemented
SF0091 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $280 $0 Implemented
SF0091 # 05 Y:1996 05 1996 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,017 $0 Not Implemented
ME0184 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,017 $11,793 Implemented
ME0184 # 02 Y:1996 02 1996 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,210 $8,250 Implemented
ME0184 # 03 Y:1996 03 1996 RECOVER WASTE HEAT FROM EQUIPMENT $1,212 $930 Implemented
ME0184 # 04 Y:1996 04 1996 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,716 $0 Implemented
ME0184 # 05 Y:1996 05 1996 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,068 $0 Implemented
ME0184 # 06 Y:1996 06 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,687 $100 Implemented
ME0184 # 07 Y:1996 07 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $449 $1,000 Implemented
ME0184 # 08 Y:1996 08 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $350 $350 Implemented
ME0184 # 09 Y:1996 09 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $209 $100 Implemented
ME0184 # 10 Y:1996 10 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,600 $0 Implemented
TN0553 # 01 Y:1995 01 1995 SHUT OFF PILOTS IN STANDBY EQUIPMENT $810 $0 Implemented
TN0553 # 02 Y:1995 02 1995 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,313 $1,320 Implemented
TN0553 # 03 Y:1995 03 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $853 $0 Implemented
TN0553 # 04 Y:1995 04 1995 USE DEMAND CONTROLLER OR LOAD SHEDDER $14,284 $20,800 Not Implemented
AR0011 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,614 $2,225 Implemented
AR0011 # 02 Y:1993 02 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $13,006 $1,690 Not Implemented
AR0011 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,990 $250 Implemented
AR0011 # 04 Y:1993 04 1993 REDESIGN PROCESS $50,000 $145,000 Not Implemented
AR0011 # 05 Y:1993 05 1993 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,207 $1,000 Not Implemented
ND0038 # 01 Y:1992 01 1992 REDUCE VENTILATION AIR $15,099 $7,200 Not Implemented