IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

13

matching recommendations
Reset
SIC 2542 Partitions And Fixtures, Except Wood
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0073 # 01 Y:1989 01 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,457 $450 Not Implemented
RU0073 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,131 $325 Implemented
RU0073 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,227 $2,028 Implemented
RU0073 # 04 Y:1989 04 1989 AIR CONDITION ONLY SPACE NECESSARY $846 $0 Not Implemented
RU0073 # 05 Y:1989 05 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,635 $645 Implemented
RU0073 # 06 Y:1989 06 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $278 $0 Implemented
RU0073 # 07 Y:1989 07 1989 RECOVER WASTE HEAT FROM EQUIPMENT $3,530 $44,000 Not Implemented
UD0277 # 01 Y:1989 01 1989 INSTALL TIMERS AND/OR THERMOSTATS $3,698 $500 Implemented
UD0277 # 02 Y:1989 02 1989 INSTALL TIMERS AND/OR THERMOSTATS $2,053 $250 Implemented
UD0277 # 03 Y:1989 03 1989 INSTALL TIMERS AND/OR THERMOSTATS $2,413 $1,125 Implemented
UD0277 # 04 Y:1989 04 1989 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,165 $1,500 Implemented
UD0277 # 05 Y:1989 05 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $746 $1,500 Implemented
UD0277 # 06 Y:1989 06 1989 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,464 $5,850 Implemented