IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

264

matching recommendations
Reset
SIC 259 Miscellaneous Furniture And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0326 # 05 Y:2005 05 2005 INSTALL TIMERS AND/OR THERMOSTATS $3,139 $900 Implemented
NC0326 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $766 $503 Implemented
NC0326 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,112 $50 Implemented
NC0326 # 08 Y:2005 08 2005 IMPROVE SPACE COMFORT CONDITIONING $800 $350 Implemented
BD0290 # 01 Y:2005 01 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,277 $15,080 Implemented
BD0290 # 02 Y:2005 02 2005 RECOVER WASTE HEAT FROM EQUIPMENT $7,841 $9,598 Implemented
BD0290 # 03 Y:2005 03 2005 USE RADIANT HEATER FOR SPOT HEATING $7,323 $4,000 Not Implemented
BD0290 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,855 $825 Implemented
BD0290 # 05 Y:2005 05 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,346 $2,325 Not Implemented
BD0290 # 06 Y:2005 06 2005 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,597 $100 Implemented
BD0290 # 07 Y:2005 07 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $810 $1,000 Implemented
BD0290 # 08 Y:2005 08 2005 INSTALL OCCUPANCY SENSORS $530 $1,000 Implemented
BD0290 # 09 Y:2005 09 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $429 $0 Implemented
BD0290 # 10 Y:2005 10 2005 INSTALL FOSSIL FUEL MAKE-UP AIR UNIT $396 $750 Implemented
BD0290 # 11 Y:2005 11 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $267 $265 Implemented
BD0290 # 12 Y:2005 12 2005 USE EVAPORATION TO CONCENTRATE MATERIAL $2,604 $2,500 Not Implemented
BD0290 # 13 Y:2005 13 2005 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,381 $700 Implemented
BD0290 # 14 Y:2005 14 2005 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $406 $450 Implemented
BD0290 # 15 Y:2005 15 2005 METER WASTE WATER $728 $250 Implemented
WI0463 # 06 Y:2004 06 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,605 $840 Not Implemented
WI0463 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,859 $29,148 Not Implemented
WI0463 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $15,360 $2,000 Not Implemented
WI0463 # 02 Y:2004 02 2004 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $17,690 $17,690 Not Implemented
WI0463 # 01 Y:2004 01 2004 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $75,927 $18,500 Not Implemented
WI0463 # 05 Y:2004 05 2004 UPGRADE CONTROLS ON COMPRESSORS $11,920 $12,595 Not Implemented