IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,615

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0061 # 01 Y:1989 01 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,000 $270 Implemented
AM0061 # 02 Y:1989 02 1989 OPTIMIZE PLANT POWER FACTOR $18,950 $29,790 Implemented
AM0061 # 04 Y:1989 04 1989 INSULATE BARE EQUIPMENT $2,990 $1,000 Implemented
AM0061 # 05 Y:1989 05 1989 REPAIR AND ELIMINATE STEAM LEAKS $3,029 $840 Implemented
AM0061 # 07 Y:1989 07 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,275 $500 Implemented
AM0058 # 01 Y:1989 01 1989 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $1,450 $0 Implemented
AM0058 # 02 Y:1989 02 1989 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $280 $300 Implemented
GT0367 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,492 $832 Implemented
GT0367 # 03 Y:1989 03 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $388 $379 Implemented
GT0367 # 05 Y:1989 05 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $551 $0 Implemented
GT0367 # 08 Y:1989 08 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $910 $0 Implemented
GT0367 # 09 Y:1989 09 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $165 $125 Implemented
KU0271 # 02 Y:1989 02 1989 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $5,826 $297 Implemented
KU0271 # 03 Y:1989 03 1989 KEEP BOILER TUBES CLEAN $5,300 $1,500 Implemented
KU0271 # 07 Y:1989 07 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,406 $100 Implemented
KU0271 # 08 Y:1989 08 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,370 $7,134 Implemented
KU0271 # 09 Y:1989 09 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,445 $1,500 Implemented
LT0140 # 01 Y:1988 01 1988 INSTALL TIMERS AND/OR THERMOSTATS $4,045 $1,350 Implemented
LT0140 # 03 Y:1988 03 1988 INSULATE BARE EQUIPMENT $945 $680 Implemented
LT0140 # 05 Y:1988 05 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $322 $0 Implemented
WI0043 # 02 Y:1988 02 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $524 $0 Implemented
WI0043 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,890 $4,906 Implemented
WI0043 # 04 Y:1988 04 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,044 $6,500 Implemented
WI0043 # 05 Y:1988 05 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,737 $0 Implemented
WI0043 # 06 Y:1988 06 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,056 $500 Implemented